About Urban Transport Department:
This directorate works as a Single window service provider, for the technical clearance and safety certification of Full Metro System coming up in India consisting of Civil Infrastructure , OHE , Signaling and the Rolling Stock (Electrical and Mechanical Both). Interim Speed Certificates are issued for operation of the rolling stock after the technical clearance of all the systems and after successful Oscillation & EBD trials conducted by Testing Directorate.
Organization chart:

Brief achievement of the Directorate in the last one year:
-
Interim speed certificates (ISCs) have been issued /extended to Five Metro systems.
-
Provisional Speed Certificates have been issued to MMOPL SG 8W,MMOPL DESL & MMRCL SG 8W.
-
Guideline for preparation of Design Basis Report (DBR) for Underground Structures to be constructed with Cut & Cover Method have been prepared and converted into National standard.
-
Standard Formats for Certificates: Standard Formats were developed and uploaded on the Online Portal for :-
-
Rolling Stock Fitness Certificate for Oscillation & EBD Trials
-
Track Fitness Certificate for Oscillation & EBD Trials
-
Bridge & Structure Fitness Certificate for Oscillation & EBD Trials
Current assignment in hand:
Metro certification:
-
MP Metro (Bhopal & Indore).
-
K-Ride
-Bengaluru Suburban Rail Project.
-
Pune IT City Metro Rail Ltd.
-
Agra Metro Rail Project (UPMRCL)
-
GMRC (Surat Metro Project)
-
Patna Metro Rail Corporation Ltd.
-
DMRC Phase-IV.
-
BMRCL E-W & N-S Corridors including Four Extensions and Reach -5.
-
Chennai Metro- phase-II.