About Urban Transport Department:
This directorate works as a Single window service provider, for the technical clearance and safety certification of Full Metro System coming up in India consisting of Civil Infrastructure , OHE , Signaling and the Rolling Stock (Electrical and Mechanical Both). Interim Speed Certificates are issued for operation of the rolling stock after the technical clearance of all the systems and after successful Oscillation & EBD trials are conducted by Testing Directorate.
Organization chart:

Brief achievement of the Directorate in the last one year:
-
Interim speed certificates (ISCs) have been issued /extended to Five Metro systems.
-
Provisional Speed Certificates have been issued to DMRC, increasing the operational speed from 40 Kmph to 60 Kmph, for BG 8W CMV (Ph II), SG 8W CMV (Ph II) & operational speed from 25 Kmph to 60 Kmph for SG 8W CMV (Ph III). This will reduce the time travel and result in increased availability of OHE maintenance.
-
Guideline for preparation of Design Basis Report (DBR) for Underground Structures to be constructed with Cut & Cover Method have been prepared and converted into National standard.
-
Standard Formats for Certificates: Standard Formats were developed and uploaded on the Online Portal for :-
-
Rolling Stock Fitness Certificate for Oscillation & EBD Trials
-
Track Fitness Certificate for Oscillation & EBD Trials
-
Bridge & Structure Fitness Certificate for Oscillation & EBD Trials
Current assignment in hand:
Metro certification:
-
MP Metro (Bhopal & Indore).
-
K-Ride, Bangalore.
-
Pune IT City Metro Rail Ltd.
-
Patna Metro Rail Corporation Ltd.
-
Agra Metro Rail Project (UPMRCL )
-
Mumbai Metro Rail Corporation Ltd (Line 3)
-
GMRC (Surat Metro Project)
-
DMRC Revised Annexure C2
-
BMRCL PH-II
-
PUNE Metro (Repeat Osc. & EBD trials on extended section)
-
Chennai Metro- phase-II.
-
Noida Metro-extension to Greater Noida