Technical Instruction No. TI/IN/0048 for implementing Cyber Security in the existing Supervisory Control and Data Acquisition System for 25 kV and 2x25 kV Single Phase 50Hz AC Traction Power Supply used in Indian Railways as per old Specification has been issued to Zonal Railways.
-
Technical Instruction No. TI/IN/0052 regarding Standard Operating Procedure for implementing Cyber Security Guidelines for protection of Critical Information Infrastructure (CII) of Indian Railways with respect to SCADA System has been issued to Zonal Railways.
-
Prototype testing and approval of 02 nos. of vendors for SCADA System as per revised Specification TI/SPC/RCC/SCADA/0134 carried out.
-
Revised specification No. TI/SPC/PSI/CLS/0025 for Control and Distribution panel for Color Light Signaling Supply in 25 kV AC Traction System has been issued.
-
Revised specification No. TI/SPC/PSI/AFL/0240 for Auto Transformer Neutral Current Ratio Based Automatic Fault Locator for 2X25 kV AC Traction System has been issued.
-
Revised specification No. TI/SPC/PSI/AUTOTR/1201 for 8MVA, 12.3MVA and 16.5MVA, ONAN, 55/27.5 KV Autotransformer has been issued.
-
Revised specification No. TI/SPC/PSI/LCMLA/0032 for Technical specification of leakage current monitor for lightning arrester has been issued.
-
A schedule of technical requirements (STR) No.IS/RDSO-TI/0001:0025 for approval of vendors for supply of Power Quality Restorer for 25kV and 2X25kV Traction System in Indian Railways has been prepared and issued.
-
A & C Slip No. 1 of Specification No. TI/SPC/PSI/LVCBIN/0121 (05/23) for 25kV Single Pole, Double Pole, Pole Mounted, outdoor Vacuum Circuit Breaker (VCB), and Vacuum Interrupter (BM) for Indian Railway has been issued.
-
02 Firms have been approved as “developmental vendor” after prototype Tests per the Specification No. TI/SPC/PSI/LVCBIN/0121 (05/23) for the items -25kV Double Pole Vacuum Circuit Breaker and Vacuum Interrupter.
-
Re-validation of 01 firm as per revised Specification No. TI/SPC/PSI/LVCBIN/0121 (05/23) with A& C Slip No. 1) for the items -25kV Single pole and Double Pole Vacuum Circuit Breaker and Vacuum Interrupter has been approved.
-
11 nos. Drawings for TSS, SP & SSP of Double line section have been revised and issued to zonal Railways on 10.03.2025.
-
A & C Slip No. 1 of Specification No. TI/SPC/PSI/TRNPWR/4200 for Single Phase Dual LV Winding Traction Power Transformersfor Indian Railways has been issued.
-
Number of Developmental vendors for item; 60/84/100MVA, 132/2X55kV and 220/2X55kV Scott Connected Traction Power Transformer has been increased from 01 to 04 and 00 to 01 respectively.
-
Number of Developmental vendors for item; 38/53/63MVA, 132/2X27.5kV and 220/2X27.5kV Single Phase Dual LV Winding Traction Power Transformer has been increased from 02 to 04 and 00 to 02 respectively.
-
Number of Developmental vendors for Autotransformers has been increased i.e. 02 to 03 for 8MVA, 02 to 03 for 12.3MVA & 03 to 04 for 16.5 MVA.
-
Relay setting guideline for Delta-I and backup DPR relay developed as per RDSO specification no. TI/SPC/PSI/PROTCT/6072 for 25KV AC traction system has been issued to Zonal Railways.
-
Specification no. TI/SPC/PSI/PROTCT/6072 to incorporate overload protection to OHE under first sub-sector has been revised and issued to Zonal Railways.
-
Vibration test and Contact wire wear test carried out in TI Laboratory for 90 nos. and 4 nos. of samples respectively.
-
Development of 107 sq.mm Silver Bearing Grooved Copper Contact wire. Issued specification and STR for use over IRs.
-
Development of Higher diameter CCR rod is being done though EOI. Proto type testing of two indigenous firms for this item have been completed. Advance correction slip no. 34 to ACTM Vol. II, Part-II, appendix I, para no. 18.11; ACTM Vol.–II, Part–II, fig A1.10 and ACTM Vol–II, part–I, chapter-7, Para 20703- Sub para 4.1 with regard to distance between OHE structure and signal post has been issued.
-
Technical Instruction No. TI/IN/0047 for “General Guidelines to Zonal Railways for OHE design in concourse area for station development projects” has been issued to Zonal Railways.
-
Maintenance Instruction No. TI/MI/0055 Rev. 1 on “Identification of Defects on Traction Installation using Thermo Vision Camera and Preventive Action” has been issued to Zonal Railways.
-
Instruction regarding Live line Monitoring Gauge (LLMG) issued to Zonal Railways.
-
Approval of Clearance study at Bikaner (BKN) ROB Loc. between 460/27 & 28- 460/29 & 30 of Bikaner Station for execution of Railway Electrification Work has been issued.
-
MoU signed with IIT Madras dated 28.03.2025 regarding Drone Inspection of OHE Parameters.
-
Audit of various TRD Depots of Indian Railway.
-
Approval of one firm for item “Short Neutral Section” and two firms for “Light Weight Section Insulator Assembly”.
-
Approval of one firm for item Five Pulley ATD and for item Spring ATD for 2400kgf tension respectively.
-
Instruction issued to Zonal Railway for uses of steel dropper/multiple copper droppers at girder bridges.
-
Letter issued to RB regarding Revision of Metro Railways (General) Rules, 2020 No. 73(4) and 78(4).
-
Special Maintenance Instruction No. TI/MI/0059 Rev - 3 issued to all ZRs for Provision of Anti-bird disc & Packing saddle (RI No. 1174) with Catenary Suspension clamp (RI No.1161).
-
Special Maintenance Instruction No. TI/MI/0055 Rev- 2 issued to all ZRs for “Identification of Defects on Traction Installation using Thermo Vision Camera and Preventive Action.
-
ACS of ACTM regarding Commissioning of Electric Traction-Necessary amendments to the ACTM Vol. II, Part-I (Revised-2022) of Chapter-10 Indian Railway and ACS of ACTM regarding Competency for Isolator operation by Group- D TRD staff has been sent to Railway Board for approval.
-
Committee Report Rev-1 on MSG Item no. 31.1: Catenary strands cut inside suspension clamps has been issued.
-
Development of Dedicated Test track at Nawa City, Jaipur.
-
Use of 150 sq.mm Hard Drawn Stranded Copper wire in place of 234 sq. mm (Aluminium spider) with 65/107 mm2 OHE Configuration for 2X25kV AC Traction System issued to Railway Board.
-
Revised Drawing of Parallel clamp ETI/OHE/P/1550 Rev F has been issued to Zonal Railway.
-
RDSO has issued an arrangement carrying of feeder wire directly on the top mast without super mast or carrying of feeder wire on small length of super mast along with cross arm on opposite side of OHE in connection with 2x25 KV systems in Indian Railways.
-
Provision/arrangement has been provided to WR regarding suitable guy rod and Anchor loop for Proposed OHE having tension 3000 kgf required for up-gradation of catenary and contact wire (125/150 sq.mm) to improve reliability of OHE in VR-DRD section of Mumbai division.
-
Drawings regarding OHE Mast Employment schedule for various wind zones with 1500 kgf tension in 125 mm2 catenary wire & 1500 kgf tension in 150 mm2 contact wire for HDN route has been issued to all Zonal Railways.
-
Specification for Tensile Testing machine has been revised.
-
Handling Instruction for 25 kV Porcelain insulator No. TI/IN/0051, Rev-0 issued.
-
Dispatch clearance and Inspection Certificate have been issued for 0 9 Nos. 8W-DETC (#005 to #013) manufactured by M/s SAN Engineering & Locomotive Co. Ltd., Bangalore, (after Routine inspection carried out against Railway Board’s P.O.
-
Guidelines/instructions for modification in Exhaust end pipe assembly and trap door in 8 Wheeler DHTC of M/s. BEML make has been issued.
-
Maintenance Instruction No. TI/MI/0043 Rev.4 for 8-Wheeler Tower Wagons covering Instructions for DETC and DHTC, have been revised and issued after obtaining approval from Railway Board.
-
Guideline for retro fitment of speed recorder in Mark-II 4-Wheeler Tower Wagons issued for the implementation by All Zonal Railways in balance Mark-II 4-Wheeler Tower Wagons which have significant residual life (minimum 2 years).
-
Corrigendum Slip no. 01 to A & C Slip no. 01 of Technical Specification no. TI/SPC/ONE/NETRA10143 (03/2022) for B.G. ONE Parameter Recording cum Test Car (NETRA) for Electrical Traction at 160 kmph has been issued.
-
33rd Maintenance Study Group (MSG/TrD) Meeting conducted at Baroda House New Delhi and recommendations regarding maintenance and standardization have been circulated to Zonal Railways.
-
321 Hours (215 Certificate/5547 Marks/points earned) in Karmyogi training by staff and officers of TI Directorate and 301 Man-days set target of training to staff is achieved as 486 Man-days.
-
Special drive of cleaning was conducted in Directorate.
-
Vendor development of 25kV & 2x25kV PSI Items such as Double Pole Vacuum Circuit Breaker, Vacuum Interrupter, SCADA, Control & Relay Panel and 8MVA, 12.3 MVA & 16 MVA Auto-transformers and 132kV & 220kV Scott-connected & V-connected Power traction transformers, Power Quality Restorer and Automatic Fault Locator, Manual and Motorized Isolator, Lightning Arrester, Capacitor Bank, Reactor, Auxillary Transformer, CT and PT.
-
Revision of STR No. TI/STR/002(Revision-3) for including M&P and T&P requirements for vendor approval for supply of Automatic Fault Locator for 2X25KV AC Traction System.
-
Development of vendor for Power Quality Restorer (PQR) for 25KV and 2X25KV AC traction Substation in Indian Railways.
-
Development of vendor for Auto Transformer Neutral Current Ratio Based Automatic Fault Locator for 2X25 kV AC Traction System.
-
Preparation of Technical document to introduce Digital Traction Substation in Indian Railways.
-
Tender for the work “Power supply simulation for running train at 200kmph Simulation”.
-
Impedance Calculation and load flow analysis in Railway Traction System (1x25kV and 2x25kV System) by IIT Roorkee.
-
Development of measurement techniques for return current through rail, and investigations on computation of rail potential rise by IIT Kanpur.
-
Preparation of TSS/SP/SSP drawings for 2X25kV System.
-
Revision of Specification of Leakage Current Monitor for Lightening Arrester.
-
Revision of RDSO Specification No. TI/SPC/PSI/LVCBIN/0121 for Vacuum circuit breaker and Interrupter.
-
Revision of Maintenance instruction No.TI/MI/00039 Rev.3 for ‘Schedule forOverhauling of Traction Power Transformer’.
-
Revision of Specification of Gas Chromatograph.
-
Tender for the work “Dynamic Simulation of OHE & Pantograph Interaction for operation of trains up to 200 kmph”.
-
Technical Guidelines for High Rise OHE for 160kmph train operation.
-
Development of Anti Bird Disc using Polycarbonate sheet- Revision of SMI no. TI/MI/0059 for Provision of Anti-bird disc & Packing saddle (RI No. 1174) with Catenary Suspension clamp (RI No.1161)
-
Development of Design and Drawings for higher contact wire size of 150mm2 contact wire and 125mm2 catenary wire for High Density Routes.
-
Expression of Interest (EOI) for development of Modular Cantilever Assembly (MCA) for 25 KV AC Traction has been published in newspapers and uploaded on RDSO website. In response of above 14 firm have been applied for the same.
-
Development of 125 sqmm. Catenary & 150 sqmm. Contact Wire of OHE fitting.
-
Development of indigenous vendors of OHE items.
-
Development of design, detailing and preparation of general assembly drawings, shop sketches and erection/construction drawings of civil structures and their foundations for 2x25 kV OHE system of portal system i.e., upright structure (vertical member) different length of boom (horizontal member) with their foundation of 40m, 45m and 50 m for 1200 kgf tension in catenary wire 65mm2 and 1200 kgf tension in contact wire 107 mm2 for OHE, 4 feeder wire, 2 Aerial earth conductor, 2 anchors one on each upright for conventional OHE for wind pressure 216 kgf/m2.
-
Development of 1600mm CD Porcelain and Composite Post, Operating Rod & Sectioning Insulator through EOI.
-
Feasibility assessment to find out the faulty/ failed 25kV composite insulators used in electric traction by IIT Kanpur.
-
New Work ‘Supply, installation, testing and commissioning of Electrodynamic Vibration Shaker System’ has been sanctioned. Procurement of machine is under process.
-
Project with IIT Madras regarding Drone Inspection of OHE Parameters.
-
POC trial of Pantograph Condition Monitoring System of M/s Rail Vision.
-
POC trial of Smart Pantograph & OHE Monitoring System of M/s Transmission Dynamics.
-
POC trial of Overhead Monitoring System of M/s PANTOhealth.
-
Revision of Specification no. TI/SPC/OHE/SNS/0000 for Short Neutral Section.
-
EOI for development of Specification for AI based OHE monitoring system.
-
Preparation of Guidelines for Maintenance of Railway owned Transmission Lines.
-
EOI for development of Specification and STR for ROCS and RRCS.
-
EOI for development of Specification and STR for MCS
-
OHE clearance report Inadequate Headroom and Overhead Equipment (OHE) Challenges under
-
Overline Structures on Bridges and Tunnels across the Indian Railway
-
Special Maintenance Instruction No. TI/MI/0050 Rev.3 is under revision for “Bird-menace”.
-
Services for Dedicated Test Track: Design Review, Verification and Validation of Dedicated Test Track including Technical Advisory Assistance during Construction of Dedicated Test Track for Indian Railway"
-
Preparation of Technical Guideline for High Rise OHE in order to make it fit for 160 kmph speed.
-
Preparation of Dropper schedule for Guideline of 125/150 OHE on High Density Routes.
-
Revision of 2*25 KV guideline for 160kmph speed with compendium.
-
Quarterly site visit of DTT & meeting among RDSO, NWR/Con. and Consultant (TUV/SUD) till completion and corresponding remarks on TUV SUV LOP & site visit Report.
-
Development of Galvanized stranded steel traction bond.
-
Development of Galvanized ERW steel tubes & Counter Weight Guide Tube.
-
Development of Aluminum Bronze / Tin Bronze fittings.
-
EOI for development of Specification and STR for Rail earth clamp.
-
Development of Vendors for Forged Steel Fittings.
-
Development of Vendors for Steel Galvanized Fittings.
-
Development of vendors for Section Insulator Assembly without insulator.
-
Revision of specification for Short Neutral Section.
-
Guideline for maintenance of Transmission Line.
-
AI based condition monitoring systems.
-
Drone inspection of OHE parameters in Indian Railways.
-
Development of Current Carrying Flexible dropper.
-
Development of Cu-Mg Catenary wire.
-
Development of 107 sq mm, 150 sq mm & 193 sq mm contact wire through contirod process.
-
Development of design and drawing of employment schedules and drilling schedules for 9.8m & 10.2m OHE masts for all wind for 2.8m, 3.80m & 4.85m implantations.
-
Design and drawing of Employment Schedules for High Rise OHE (2x25kV) without super mast.
-
Development of cylindrical foundation with CRR.
-
Checking of portal suitability of High Rise OHE guideline for 160 Kmph.
-
Design checking of High Rise OHE mast submitted NWR for test track.
-
ACS to AC Traction Manual for Tool & Plant (T&P) for maintenance of 2x25 kV AC Traction System.
-
Specification for Rail cum Road vehicle to be framed.
-
Routine Inspection of 8W-DETC manufactured by M/s SAN Engineering & Locomotive Co. Ltd., Bangalore as Railway Board’s P.O.
-
34th Maintenance Study Group (MSG/TrD) Meeting to be conducted at NCR Prayagraj for improvements in maintenance and standardization by Zonal Railways.
-
Development of MRI in Tower wagon.
-
Development of NETRA car.
-
Development of Twin Tower Wagon.
-
Development of Dual Mode Tower car.
-
Issuing Maintenance Instructions/Guidelines to Zonal Railways regarding Tower car.
-
Revision of SMI (Maintenance Schedule) of 4 W Tower Wagon.
-
Revision of 8WDETC Specification.