Indian Railway main logo Welcome to Indian Railways RDSO Logo
   
View Content in Hindi
National Emblem of India

About Us

Verticals

Tenders

Vendor Interface

Specifications/Drawings

Contact Us

Verticals
   Traction & Power Supply
      Loco, EMU & Power Supply
         Reliability Meetings
            Bogie/Mech. Equipments


Bookmark Mail this page Print this page
QUICK LINKS
Bogie/Mech. Equipments

Bogie/Mech. Equipments

 

Date File No./Doc. Description
16.11.2020 EL/2.2.13 Letter along with MoM for Discussion held on 12.11.2020 on Mechanical items failures of Traction motor type 6FRA-6068 TMs with TM manufacturers.
29.07.2019 EL/3.35/2(TMS)

Minutes of the workshop cum meeting held at ELS/GZB on reliability issues of motor supports fitted in bogies of WAP7/WAG9/WAG9H three phase Electric Locomotives

02.04.2019 EL/3.1.35/2 MoM dated 29.03.2019 regarding issue of all metal prevailing torque type hexagonal lock nut used in three phase loco.
20.03.2019 EL/3.35/2(Bogie) MoM dated 05.03.2019 regarding performance review meeting for reliability of the brake gears of three phase locomotives.
12.03.2019 EL/3.1.35/12 MoM dated 05.03.2019 regarding performance and reliability of traction link used in three phase locomotives.
12.03.2019               EL/3.1.35/20                 Minutes of Meeting dated 01.03.2019 regarding Shaft Pinion of 3 Phase Locomotives.
12.03.2019               EL/3.2.119(CBC)          MoM dated 28.02.2019 regarding review pefromance and reliability of CBC/Draft gear/TSC used in electric locomotives.
25.02.2019  EL/3.1.35/12(SB) MoM dated 19.02.2019 regarding Issues of spheriblock in three phase locomotives
31.12.2018              EL/3.2.119(CBC)          MoM dated 24.12.2018 regarding failure of M/s Renka make CBC.
26.12.2018              EL/3.1.35/22                 MoM dated 20.12.2018 regarding failure of hurth coupling in WAP-5 electric locomotives.
29.11.2018 EL/3.1.35/12(SB) MoM dated 27.11.2018 regarding failure of spheriblock in three phase locomotives
28.11.2018 EL/2.2.13 MOM for expediting the supply of Traction Motor/Motor Suspension Unit/Axle Box/Auxiliary Machine bearing held at RDSO on 16.11.2018.
09.10.2018 EL/3.1.35/12 MoM dated 28.09.2018 regarding failure of traction link in three phase locomotives
09.10.2018               EL/3.1.35/12                 MoM dated 28.09.2018 regarding failure of elastic ring in three phase locomotives.
01.10.2018 EL/3.1.35/12(SB) MoM dated 27.09.2017 regarding failure of spheriblock in three phase locomotives.
29.08.2018               EL/3.1.35/20                 Minutes of Meeting dated 21.08.2018 regarding Shaft Pinion of 3 Phase Locomotives.
27.08.2018               EL/3.2.13/6                   MoM dated 27.08.2018 regarding failure of fabricated bloster of WAP-4 electric locomotives.
12.07.2018               EL/3.2.119(CBC)          MoM dated 05.07.2018 regarding failure of CBC coupler in three phase locomotives.

27.06.2018             

 EL/3.1.35/12(SB)        MoM dated 25.06.2018 regarding failure of spheriblock in three phase locomotives.
07.06.2018 EL/3.135/12 MoM dated 05.06.2018 regarding failure of traction link in three phase locomotives
07.06.2018              EL/3.1.35/12                 MoM dated 06.06.2018 regarding failure of elastic ring in three phase locomotives
26.04.2018              EL/3.2.119(CBC)               MoM dated 26.04.2018 regarding issues of dampers used in diesel to electric converted locomotives.
09.03.2018               EL/2.2.13                 MoM regarding supply issues for bearings of Traction Motor/MSU/Axle box held at RDSO on 09.03.2018
30.01.2018              EL/3.2.119(CBC)          MoM dated 11.01.2018 regarding review pefromance and reliability of CBC/Draft gear/TSC used in electric locomotives.
17.01.2018              EL/3.35/12                   MoM dated 29.12.2017 regarding failure of traction link in three phase locomotives.
03.01.2018             EL/3.2.119(CBC)          MoM dated 03.01.2018 regarding failure of transition screw coupling in electric locomotives
26.09.2017              EL/3.1.35/12                 MoM dated 25.09.2017 regarding faillure of Elastic ring in three phase locomotives.
11.08.2017 EL/3.1.35/12 MoM dated 09.08.2017 regarding failure of traction link in three phase locomotives.
09.08.2017              EL/3.2.172(SMU)          MoM dated 08.08.2017 regarding failure of sandwitch mounting unit in electric locomotives.
19.05.2017 EL/3.2.108/3 Phase MoM dated 18.05.2017 regarding issues of CRU 150 type of axle box bearings used in WAG-9/WAP-7 loco.
26.04.2017 EL/3.1.35/20

Minutes of the meeting dated 26.04.2017 regarding failure of 21 teeth pinion of WAP9 locomotives.

22.02.2017  

Minutes of meeting held at RDSO on 22.02.2017 regarding failure of TM Pinions in WAG9 electric locomotives

21.12.2016 EL/3.2.108/3 Phase Issues of CRU 150 type of axle box bearings used in WAG-9/WAP-7 loco.
30.09.2016 EL/3.2.19/5 Issues of  L type composite  brake block

 



Source : WELCOME TO RDSO CMS Team Last Reviewed on: 19-09-2022  

  Site Map | Contact Us | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

� 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.