Indian Railway main logo Welcome to Indian Railways RDSO Logo
   
View Content in Hindi
National Emblem of India

About Us

Verticals

Tenders

Vendor Interface

Specifications/Drawings

Contact Us

Verticals
   Traction & Power Supply
      Loco, EMU & Power Supply
         Reliability Meetings
            Propulsion System


Bookmark Mail this page Print this page
QUICK LINKS
Propulsion System

 Propulsion System

Date File No./Doc. Description
30.08.2019 EL/4.2.17

Meeting at Railway Board on 27.08.2019 on Operation of Trains with Electric Locos in Push-Pull Mode.

29.07.2019 EL/4.2.17

Meeting at Railway Board on 22.07.2019 on interfacing the passenger comfort amenities like Passenger Information System (PIS), Door Opening and Closing System etc with the TCN Compliant VCU.

12.06.2019 EL/4.2.17

Minutes of the Meeting held at RDSO, Lucknow on 10.06.2019 on reliable scheme for operation of trains in push-pull mode.

03.05.2019 EL/11.5.5/21 MOM on issues of IGBT based aux and power converter of M/s CGPISL
03.05.2019 EL/11.5.5/21 MOM on issues of IGBT based aux and power converter of M/s BTIPL
03.05.2019 EL/3.2.19/RB/4QC MOM for developement of four quadrant control converter for WAG7 electric locomot
02.05.2019 EL/11.5.5/21 MOM on issues of IGBT based aux and power converter of M/s Medha.
24.04.2019 EL/11.5.5/21 Reliability of propulsion system of three phase locomotives.
29.03.2019 EL/11.5.5/21

Minutes of Meeting on reliability of M/s BHEL make IGBT based Propulsion system of 3-phase locomotives.

12.03.2019 EL/3.1.35/12 Performance and reliability of traction link used in three phase locomotives.
20.02.2019 EL/11.5.5/21

Minutes of the Meeting held at ELS/HWH/ER on 14-15.02.19 on reliability of Propulsion Equipments of IGBT based 3-phase locomotives.

16.11.2018 EL/11.5.5/21

Minutes of the Meeting held at RDSO, Lucknow on 16.11.2018 on Reliability of M/s CGPISL make IGBT based converters fitted in three phase electric locomotives.

14.11.2018 EL/11.5.5/21

Minutes of the Meeting held ELS/TKD/WCR on 30.10.2018 on performance review of Three Phase Electric Locomotives.

09.10.2018 EL/3.1.35/12 Failure of traction link in three phase locomotives
06.08.2018 EL/11.5.5/21 Minutes of Meeting held at RDSO/LKO on 03.08.2018 regarding issues of coolant to be used in Traction Converter of 3-phase locomotives.
01.08.2018 EL/11.5.5/5 Minutes of Performance review meeting held at ELS/Bhilai and Raipur division on 19.07.2018 & 20.07.2018 regarding Propulsion equipment of GTO and IGBT based T.M converters and traction motor temperature sensors, transformer oil pressure sensors & Fire detection unit of 3 phase locomotives.
27.07.2018 EL/11.5.5/5 Minutes of the Meeting on reliability of GTO and IGBT based traction converter (SR) auxiliary converter (BUR) and vehicle control unit (VCU) in three phase locomotives.
05.07.2018 EL/11.5.5/21 Reliability meeting of M/s Medha make IGBT based Propulsion System fitted in 3-ph loco held at RDSO on 05.07.2018
05.07.2018 EL/11.5.5/21 Reliability meeting of M/s ABB make IGBT based converters fitted in 3-ph loco held at RDSO on 05.07.2018
04.07.2018 EL/11.5.5/21

Minutes of the Meeting held at RDSO, Lucknow on 2.7.2018 on Reliability of M/s BTIPL make IGBT based converters fitted in three phase electric locomotives.

02/3.07.2018

EL/11.5.5/5

MOM regarding Reliability meeting of M/s CGL make IGBT based converters fitted in 3-phase loco held at RDSO on 02.07.2018

21.06.2018

EL/11.5.5/5

Minutes of meeting held at RDSO , Lucknow on 20.06.2018 on Reliability of M/s BHEL make IGBT based converters fitted in three phase electric locomotives

07.06.2018 EL/3.135/12 FRailure of traction link in three phase locomotives
17.01.2018 EL/3.1.35/12 Failure of traction link in three phase locomotives.
11.08.2017 EL/3.1.35/12 Traction link bar in electric locomotives
09.08.2017   Failure of traction link in three phase locomotives.
14.07.2017 EL/11.5.5/5

Minutes of the Meeting held at RDSO, Lucknow on 04.07.2017 on Reliability improvement of IGBT based Power converter and Auxiliary converter of three phase electric locomotives.

12.07.2017 EL/11.5.5/5

Minutes of the Meeting held at BHEL, Bangalore on 30.06.2017 on Reliability of IGBT based propulsion system of three phase electric locomotives.

28.06.2017 nil

Meeting of Meeting held at RDSO, Lucknow on 28.06.2017 to discuss reliability issues of M/s ABB make IGBT based converters in 3-phase electric locos.

03.05.2017 EL/11.5.5/5

Minutes of the Meeting held at RDSO, Lucknow on 19.04.2017 on Reliability of GTO & IGBT based three phase electric locomotives.

21.03.2017 EL/11.5.5/6

Minutes of the Meeting to review the performance of HOG at CEE/WR office, Churchgate, Mumbai on 08.03.2017

23.01.2017 2016/Elect(TRS)/225//Misc

Minutes of performance review meeting held at IRIEEN/Nasik Road, Central Railway on 30.12.2016

19.01.2017 EL/11.5.5/5

Minutes of the Meeting held at RDSO, Lucknow on 06.01.2017 on Reliability of GTO & IGBT based three phase electric locomotives.

 



Source : WELCOME TO RDSO CMS Team Last Reviewed on: 31-10-2023  

  Site Map | Contact Us | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

� 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.