Guidelines for Earthwork in Railway Projects
|
GE:G–1, July 2003
|
2.
|
Specification for Mechanically Produced Blanketing Material for Railway Formation including Guidelines for Laying
|
GE:IRS-2, July 2005 (Final)
|
*3.
|
Standard Test Procedure for Blanket Material for Railway Formation
|
IRS:GE-3, July 2003
|
4.
|
ConBooklet on Geotechnical Testing for Railway Engineers for Quality trol
|
GE:G-3, Dec 2004
|
5.
|
Guidelines on Erosion Control and Drainage of Railway Formation
|
GE:G-4, Feb 2005
|
6.
|
Guidelines on Soft Soils- Stage Construction Method
|
GE:G-5, April 2005
|
7.
|
Guidelines for Rehabilitation of Existing Weak Formations
|
GE:G-6, June 2005
|
8.
|
Guidelines on Temporary & Permanent Restoration of Embankment after Breaches /Washouts
|
GE:G-7, July 2005
|
9.
|
Manual of Instructions for CC Cube & Rail Cluster Method
|
GE:Misc.-1, July 2005 (Provisional)
|
*10.
|
Guidelines for Cuttings in Railway Formations
|
GE:G-2,Aug’ 2005
|
*11.
|
Guidelines for Application of Jute Geotextile in Railway Embankments and Hill Slopes
|
RDSO/2007/GE:G-0008
|
12.
|
Guidelines and Specification for Design of Formation for Heavy Axle Load
|
RDSO/2007/GE:G-0014
|
12(A)
|
Revised Guidelines and Specification for Design/Construction of formation on Indian Railway Track for 25 T axle load
|
RS/G/108/Heavy Axle Load dt: 26.10.2016
|
*13.
|
Guideline for Geotechnical Engineering Organization in Zonal Railways
|
RDSO/2007/GE:G-0011
|
14.
|
Guidelines for Civil Engineering Inspection, Maintenance and Safety in existing Tunnels
|
RDSO/2012/GE:G-0015
|
15.
|
Guidelines for Design & Construction of Tunnels
|
RDSO/2012/GE:G-0017
|
16.
|
Guidelines for safety in Tunnels during Construction
|
RDSO/2012/GE:G-0016
|
17.
|
Guidelines on Design and Construction of Reinforced Earth Structures (for trial application in Railway sidings)
|
RDSO/2014/GE: G-0018
|
18.
|
Issue of Revised “Specification of Track Ballast”(IRS:GE-I June 2016)
|
Letter No. RS/F/7/4 Vol.IV
|
19.
|
Method Statement for Investigation, Planning and Execution of Cuttings in Soil for Railway Projects
|
Letter no. RS/G/72-CR, Vol.7
|
20.
|
Specification for Non-Woven Geo textile to be used as separator/filtration layer for railway formation (For trial application in Indian Railways).
|
RDSO/2018/GE: IRS-0004-Part-1
|
21.
|
Specification for Geo-composite Drain (Vertical) to be used behind Bridge abutment/Retaining wall (For trial application in Indian Railways).
|
RDSO/2018/GE: IRS-0006
|
22.
|
Specification for Geo-composite Drain (Horizontal) to be used at the base of the embankment for Railway formation (For trial application in Indian Railways).
|
RDSO/2018/GE: IRS-0004-Part-2
|
23.
|
Field trial on the specification for Non woven Geotextile, Geocomposite drain (Horizontal/Vertical)
|
GE/GEN/Comments/185/GCD-Vertical (Part-1) dt:24.04.2019
|
24.
|
Rationalisation of Formation Layer Thickness on Indian Railway Track |
RDSO/2018/GE: IRS-0004 (D) Part-4 |
25.
|
Specification for Geogrid to be used as reinforcement stablization for Railway Formation
|
RDSO/2018/GE: IRS-0004 Part-III
|
26. |
Comprehensive Guidelines and Specifications for Railway Formation
|
RDSO/2020/GE:IRS-0004
|