S.No.
|
Report No.
|
Title
|
Month & Year
|
1
|
BS-1
|
Investigations for Coefficient of Dynamic Augment on Concrete Girder Bridges Test on Bridge No.54 Up (3 x 18.3m + 2 x 12.2m) on Godhra-Ratlam Section of W.Railway (B.G)
|
Oct-1995
|
2
|
BS-2
|
Investigations for Dynamic Augment on Concrete Girder Bridges Test on Bridge No.162 (3x12.2m) and 163 (1 x 3.6m) on Gonda-Gorakhpur Loop Section of N.E.Railway (M.G) (300 mm ballast cushion)
|
March-1995
|
3
|
BS-3
|
Investigations for Dynamic Augment on Concrete Girder Bridges Test on Bridge No.54 (3 x 18.3m + 2 x 12.2m) on Godhra-Ratlam Section of W.Railway B.G (300 mm ballast cushion)
|
March-1995
|
4
|
BS-4
|
Load Test of Arch Bridge No.23 (1 x 18.2 m) on Sagauli-Raxual Section on N.E.Railway MG
|
Nov-1995
|
5
|
BS-5
|
Assessment of Residual Fatigue Life of Early Steel Wrought Iron Girder Bridges
|
June-1995
|
6
|
BS-6
|
Load Test on MG Arch Bridge No.13 (1 x 4.83 m span ) on Aunrihar-Chhapra Section of N.E.Railway for proposed retention other gauge conversion
|
Oct-1995
|
7
|
BS-7
|
Investigation for Determining Coefficient of Dynamic Augment on Concrete Girder Bridge No.2/25576/7 at km.255/7 (2 x 26.226 + 3 x 10.0 m span) on Roha-Veer Section on Konkan railway
|
Aug-1995
|
8
|
BS-8
|
Deflection Test on Betwa Bridge No.1086/1 (18 x 23.0 m) Welded Type Composite Span on Matatila-Basai Section of C.railway
|
March-1998
|
9
|
BS-9
|
Report on Instrumentation of Rail-Cum-Road Bridge (17 x125m + 1 x 96.6m +2 x 30.26m over Brahmaputra River at Jogighopa) N.F.Railway
|
July-1998
|
10
|
BS-10
|
Development of Vibration Signature Technique for Integrity Assessment of railway bridges (Model study on PSC Girder for Vibration performance)
|
July-1998
|
11
|
BS-11
|
Application of Vibration Signature Technique on Plate Girder Railway Bridges
|
Nov-2001
|
12
|
BS-12
|
Revised Report on Strategy for Quick Restoration of major bridge on Quazigund-Srinagar-Baramulla Section of N. Railway
|
Sept-1998
|
13
|
BS-13
|
Report on Preventing Bird Menace in Buildings and Structures
|
April-1999
|
14
|
BS-14
|
Durability of Concrete Structures
|
Jan-2001
|
15
|
BS-15
|
Report on Inspection of Bankim Setu ROB at Howrah
|
April-1999
|
16
|
BS-16
|
Report on Preventing Unwanted Growth of Plants/Weeds in Buildings and Structures
|
July-1999
|
17
|
BS-17
|
Water Proofing of Roofs
|
Sept-1999
|
18
|
BS-18
|
Measurement of Longitudinal Forces on Elastomeric Bearings on Bridge No.23, Sawai-Madhopur, Jaipur Section, W. Railway to validate L.F.Disp Programme
|
July-1999
|
19
|
BS-19
|
Report of Bridge Management System
|
Sept-1999
|
20
|
BS-20
|
Investigation for Dynamic Augment on Concrete Girder Bridges (test on Bridge No.627 between Nivasar and Ratnagari section of Konkan Railway)
|
Dec-1999
|
21
|
BS-20-A
|
Investigation on Cracks Developed in Beams of Manak Bhawan, RDSO, Lucknow
|
Oct-1999
|
22
|
BS-21
|
Report on amenities to be provided at Railway Station and other public buildings for the persons with disabilities
|
Oct-1999
|
23
|
BS-22
|
Report on Material for Railway Platform Surfacing
|
Nov-1999
|
24
|
BS-23
|
Guidelines on use of Ready-mix Concrete
|
Aug-2000
|
25
|
BS-24
|
Report on Investigation for dynamic Augment on Ballasted Deck Concrete Bridges
|
Dec-1999
|
26
|
BS-25
|
Guidelines on use of Admixtures in Concrete
|
Dec-1999
|
27
|
BS-26
|
Index of the report of the Bridge And Structures Standards Committee
|
Dec-1999
|
28
|
BS-27
|
Report on Inspection on Bridge No.4 on proposed Phusro – Jarandiah Division line on E.Railway
|
April-2000
|
29
|
BS-28
|
List of current standard Drawings issued by Bridges and Structures Directorate – Revision-21
|
May-2017
|
30
|
BS-29
|
Tunnels on Indian Railways (printed booklet)
|
Sept-1998
|
31
|
BS-30
|
Important Bridges on Indian Railways (printed booklet)
|
Jan-1999
|
32
|
BS-31
|
Impact Test on FRP Sleepers
|
Nov-2000
|
33
|
BS-32
|
Study on Noise Level on Railway Bridges
|
Dec-2000
|
34
|
BS-33
|
Effect of Vibrations due to Rail Traffic on Structures located along Railway Track
|
March-2001
|
35
|
BS-34
|
Testing of Piers of Bridge No.1585 (9x12.2m G) on Badarpur-Silchar (MG) Section of N.F.Railway
|
May-2001
|
36
|
BS-35
|
Development of cracks in the Channel Sleepers of Bridges No.184 (9 x 45.7m span girder) between Sahajanwa and Jagatbela Station on Gorakhpur-Lucknow BG route of N.E.railway
|
May-2001
|
37
|
BS-36
|
Instrumentation Techniques to Monitor loss of Pre-Stress and Corrosion of Steel in Pre-Stressed Concrete
|
June-2001
|
38
|
BS-37
|
Guidelines for Under Joint detailing using steel hollow section RHS/SHS in foot-over bridges (to be read with drawing No.CBS-0021/1-7)
|
Aug-2001
|
39
|
BS-38
|
Report on Suitability of Cement Grout for Corrosion Protection of Stay Cables of Cable Stayed ROB of Krishnarajapuarm (Bangalore)
|
Aug-2001
|
40
|
BS-39
|
Guidelines for Assessment of Residual Fatigue Life of Early Steel/ Wrought Iron Girder Bridges
|
Sept-2001
|
41
|
BS-40
|
withdrawn
|
|
42
|
BS-41
|
Guidelines for Integrity Testing of Piles
|
Oct-2001
|
43
|
BS-42
|
Guidelines on use of Micro Cover Meter
|
Oct-2001
|
44
|
BS-43
|
Measurement of lateral displacement of girders of Bridge No.1248 (Balawali Bridge) of Moradabad Division on N.Railway
|
Jan-2002
|
45
|
BS-44
|
An over view of revisions in IS:456-2000 Code of Practice for Plain and Rain Forced Concrete
|
Jan-2002
|
46
|
BS-45
|
Guidelines on Fabrication of Steel Channel Sleepers
|
2004
|
47
|
BS-46
|
Report on Impact and static load tests on FRP Sleepers (Supplied by M/s Simba FRP Pvt.Ltd., Delhi)
|
May-2002
|
48
|
BS-47
|
Report on Impact and Static Load Test on Synthetic Sleeper (developed by M/s Patail Group of Industries, Secunderabad
|
July-2002
|
49
|
BS-48
|
Guidelines for Inspection Maintenance and Rehabilitation of Concrete Bridges
|
Sept-2002
|
50
|
BS-49
|
Report on Investigation of Sub-structures of Bridge No.445 (Dhawa Bridge) near Rafiganj on Mughalsarai Division of E.Railway
|
Oct-2002
|
51
|
BS-50
|
Guidelines on use of Proformeter
|
Dec-2002
|
52
|
BS-51
|
withdrawn
|
|
53
|
BS-52
|
Guidelines on use of Corrosion Monitoring Equipments
|
March-2003
|
54
|
BS-53
|
Guidelines on use Ultrasonic Instrument for Monitoring of Concrete Structure. (Provisional).
|
April-2003
|
55
|
BS-54
|
Testing of Bridge No.65 and 226 Up Acoustic Emission Technique
|
June-2003
|
56
|
BS-55
|
NDT Testing of bridge No.1474, 1674 and T-7 in Mudurai Division of Southern Railway
|
June-2003
|
57
|
BS-56
|
Preliminary investigation report of collapse of through girder of Bridge No.63 between Gevra road and Corva Section on Gevra Road Champa Section of S.E.C.Railway on 16/17-07-2003
|
July-2003
|
58
|
BS-57
|
NDT Report of bridge No.125 and 118-A in Jammu-Udhampur Section of Udhampur Division, N.Railway
|
June-2003
|
59
|
BS-58
|
Report on impact and static load test on plastic recycled sleepers
|
Sept-2003
|
60
|
BS-59
|
Report regarding collapse of footpath slab of road over bridge (Shastri bridge in Jabalpur division), W.C.Railway
|
Nov-2003
|
61
|
BS-60
|
Non Destructive Testing of bridge on river Ganga (under construction) at Patna Danapur Division, E.C.Railway
|
June-2004
|
62
|
BS-61
|
Non Destructive Testing of bridge No.355, 366, 388 and 390 on Mumbai Division, Western Railway
|
Jan-2004
|
63
|
BS-62
|
4 Nos. of PSC girder bridges on Singrauli-Obra Section of E.C.Railway
|
March-2004
|
64
|
BS-63
|
Causes, Evaluation and repair of cracks in concrete
|
March-2004
|
65
|
BS-64
|
Collapse of FOB at Km.48/12-11 between THAKURLI-DOMBIVLI (Mumbai Division), Central railway
|
April-2004
|
66
|
BS-65
|
Non Destructive Testing of bridge No.73 on Mumbai Division, Western Railway
|
April-2004
|
67
|
BS-66
|
Non Destructive of bridge No.1066 and 1107 on Roha-Manglore Section of Konkan Railway
|
June-2004
|
68
|
BS-67
|
Non Destructive of road over bridge No.236-A on Dhanbad-Gaya Section of Dhanbad Division of E.C.Railway
|
June-2004
|
69
|
BS-68
|
Non Destructive Testing of Bridge No.123, 144, 157, 232, 242 on Cuttack-Paradep Section on Khurda Road Division of E.Co.Railway
|
Nov-2004
|
70
|
BS-69
|
Non Destructive Testing of PSC Slab No.92 of Lucknow Division N.Railway
|
Dec-2004
|
71
|
BS-70
|
Assessment of Residual Life of Ganga Bridge No.110 Dn, (near Kanpur), Lucknow Division, N.Railway
|
Dec-2004
|
72
|
BS-71
|
Condition assessment of PSC girder Bridge No.73 over Vasai Creek on Mumbai-Surat Section of Western Railway
|
March-2005
|
73
|
BS-72
|
Non Destructive Test on Bridge No.78 and 78-B of Sonpur Division, E.C.Railway
|
May-2005
|
74
|
BS-73
|
Non Destructive Test on Bridge No.52 and 53 of Samastipur Division, E.C.Railway
|
June-2005
|
75
|
BS-74
|
Non Destructive Testing of Road over Bridge (under construction) at Patna, Danapur Division, E.C.Railway
|
July-2005
|
76
|
BS-75
|
Assessment of Residual Life of Ganga Bridge No.110 Dn (Near Kanpur), Lucknow Division, N.Railway
|
Aug-2005
|
77
|
BS-76
|
Recent Advances In Seismic Design Criteria Of Bridges (Not published)
|
Report not published.
|
78
|
BS-77
|
Assessment of Residual Life of Structure of Bridge No.95211 Narmada Bridge near Jabalpur
|
Jan-2006
|
79
|
BS-78
|
Non Destructive testing on proposed Headquarter Building, N.C.Railway
|
Feb-2006
|
80
|
BS-79
|
Assessment of Residual Life of Girder of Bridges No.73 and 75 (abandoned) Vasai Creek Bridge on Borival-Virar section of Western Railway
|
May-2006
|
81
|
BS-80
|
Guidelines for design of POT-PTFE Bearing for Railway Bridges
|
Sept-2006
|
82
|
BS-81
|
Condition assessment of 3rd. Godavari bridge near Rajamundary, S.C.Railway
|
Nov-2006
|
83
|
BS-82
|
Guidelines on Use of Core Cutter and Other Miscellaneous Tools on Railway Bridge
|
Nov-2006
|
84
|
BS-83
|
Non Destructive Testing Newly construction Station Building Rewari, Jaipur Division
|
Feb-2007
|
85
|
BS-84
|
Assessment of Residual Life of Girder of Bridge No.531 Dn (Son Bridge) near Dehari-On-Sone E.C.Railway
|
May-2007
|
86
|
BS-85
|
withdrawn
|
|
87
|
BS-86
|
Non Destructive Testing of Road over Bridge No.61A on Hissar- Bhatinada Section of N.W.Railway
|
Nov-2007
|
88
|
BS-87
|
Non Destructive Test on Newly Constructed Headquarter Building , Allahabad, N.C.Railway
|
March-2008
|
89
|
BS-88 R
|
Literature on corrosion protection in concrete structures
|
August- 2018
|
90
|
BS-89
|
Guidelines for the use of High Performance Concrete in Bridges
|
March-2008
|
91
|
BS-90
|
Study of probable cause of cracks in different members and assessment of Residual Fatigue Life of Bridge No.46 Up/ Mid Line near Bilaspur
|
April-2008
|
92
|
BS-91
|
Guidelines for Assessment of Residual Fatigue Life of Steel Girder Bridges
|
May-2008
|
93
|
BS-92
|
Measurement of Vibration of the Piers of the Bridges Nos.9 and 7 on Gorakhpur-Panihawa Section of N.E.Railway
|
May-2008
|
94
|
BS-93
|
Condition Assessment of the Piers of Bridge No,133, 165 and 263 on Hassan-Manglore section of S.W.Railway
|
June-2008
|
95
|
BS-94
|
Non Destructive Test on newly constructed DRM Office Building at Agra Cantt. N.C.Railwa`y
|
July-2008
|
96
|
BS-95
|
Assessment of Residual Life of Girders of Bridge No.5A Up/Dn (Setlej Bridge), near Ludhiana
|
July-2008
|
97
|
BS-96
|
Guidelines on Under Water Inspection of Bridges
|
July-2008
|
98
|
BS-97
|
Assessment of Residual Fatigue Life of Girders of Bridge No.1554 UP near Vijianagram, East Coast Railway
|
Oct-2008
|
99
|
BS-98
|
Inspection of Bridge No.49, Asansol Division, Eastern Railway by RDSO
|
Dec-2008
|
100
|
BS-99
|
Inspection of Bridge No.178, Ajmer Division, North Western Railway by RDSO
|
Feb-2009
|
101
|
BS-100
|
withdrawn
|
|
102
|
BS-101
|
Non Destructive Testing of Road over Bridge in lieu of level crossing No.27 at Etawah, Allahabad Division, N.C.Railway.
|
July-2009
|
103
|
BS-102
|
GUIDELINES FOR INSPECTION & MAINTENANCE OF BRIDGE BEARINGS (Revision 1)
|
June, 2015
|
104
|
BS-103
|
GUIDELINES ON NON-DESTRUCTIVE TESTING OF BRIDGES
|
August, 2009
|
105
|
BS-104
|
GUIDELINES ON USE OF ACOUSTIC EMISSION TECHNIQUE (AET) ON RAILWAY BRIDGES
|
OCTOBER- 2009
|
106
|
BS-105
|
GUIDELINES ON PIPE LINE CROSSINGS UNDER RAILWAY TRACK with A&C upto 7
|
October -2009/ May-2013/ April-2014/April-2017/Nov2017
|
107
|
BS-106
|
BROAD GUIDELINES FOR INSTRUMENTATION OF BRIDGES FOR RUNNING HIGHER AXLE LOADS (Revision 1)
|
April, 2010/ Dec 2016
|
108
|
BS-107
|
Assessment of Residual Fatigue Life of Bridge No. 586 Near Koraput, East Coast Railway.
|
May-2010
|
109
|
BS-108
|
Monitoring Report of Bridges on operation of BOXN wagon loaded up to CC+8+2 tone/ CC+6+2 tone as Pilot Project on identified routes.
|
July-2010
|
110
|
BS-109
|
Design and Quality Audit Report on Landslide and Failure of Retaining Wall between Ratnagiri - Nivsar Stations on Ratnagiri - Madgaon Section of KRCL on 17.06.2011
|
July-2011
|
111
|
BS-110 (R)
|
Guidelines on Fabrication of Steel Girders for Construction/Field Engineers (Revision 1) with Addendum & Corrigendum
|
Dec-2011/July - 2017
|
112
|
BS-111
|
Guidelines for Use of High Strength Friction Grip (HSFG) Bolts on Bridges in Indian Railways (Revision - 5)
|
June-2012/ April-2016
|
113
|
BS-117
|
Scour Depth estimation, counter measures & monitoring at bridge crossing. Guide for engineers.( Revision 1)
|
June -2013/2015
|
114
|
BS-112
|
Guidelines for Planning of Road Over Bridges
|
May-2014
|
115
|
BS-113
|
Guidelines for Providing Arrangements for Bridge Inspection
|
November-2014
|
116
|
BS-118
|
RDSO Guidelines on Seismic Design of Railway Bridges (Revision 1)
|
January-2015/Nov.-2015
|
117
|
BS -119
|
Guidelines for carrying out Rail-Structure Interaction Studies for Metro systems (Revision 2)
|
January 2015
|
118
|
BS-120
|
RDSO Guidelines for Construction of Limited Height Subway (LHS) by Cut and Cover Method
|
April - 2015
|
119
|
BS-121
|
Guidelines for Provisions of OHE MAST for Electrification at New and Existing Bridge Pier/Abutment
|
October-2015
|
120
|
BS-114
|
Guidelines for Carrying out Rail-Structure Interaction for Railway Bridges (Revision 2)
|
November -2015 / August 2016
|
121
|
BS-122
|
Guidelines of RDSO approval of Planning and DBR for Important Bridges
|
November - 2015
|
122
|
BS-115
|
Guidelines for Composite Construction including Stud Shear Connectors (Revision 1)
|
Dec -2015 / April 2016
|
123
|
BS-116 R
|
Load Testing of Arch Bridges
|
June -2017
|
124
|
BS-123
|
Guidelines for checking suitability of existing sub-structure of bridges for 25T-2008 Loading
|
August-2017
|
125
|
BS-124
|
Construction of Bogibeel, Rail-Cum-Road Bridge over River Brahmaputra on N.F.Railway
|
November-2017
|
126
|
BS-125
|
Method statement for fabrication of 45.7m through type open web girder for 25t loading drawing no. B-17181 series
|
June-2018
|
127
|
BS-126
|
Guidelines for continuation of LWR/CWR over ballasted deck bridges on Indian Railways
|
|
128 |
BS-127 |
Guidelines on type of foundations for Railway bridges |
May -2019 |