Indian Railway main logo Welcome to Indian Railways RDSO Logo
   
View Content in Hindi
National Emblem of India

About Us

Directorates

Tenders

Vendor Interface

News & Events

Staff Welfare

Contact Us



Bookmark Mail this page Print this page
QUICK LINKS
Important Achievement of Last Five Year

Important Achievement of RDSO during Last Five Years

 

Financial Year

Broad Area of Achievement

Title of Achievement

Directorate

2007-08

Crew comfort

Development of Cab Air Conditioning System for Diesel Electric Locos

Motive Power

2007-08

Economy

Conversion of cast HTSC truck frame of HHP (EMD) locomotive in to fabricated design

Motive Power

2007-08

Efficiency

Development of hard facing electrodes for reconditioning of points and crossings. 

M&C

2007-08

Efficiency

Development of Flux cored wire for reclamation of Tie Tamping Tools.

M&C

2007-08

Efficiency & Reliability

Control Communication Equipment for OFC Section

Telecom

2007-08

Efficiency & Reliability

Integrated Way-Station Control Communication Equipment

Telecom

2007-08

Efficiency & Reliability 

Re-engineering of Stators of Traction Motors type 6FRA6068 making it more reliable.

Elect. Loco.

2007-08

Export

Design & develop-ment of 1400hp/ 2300hp Cape gauge & meter gauge loco-motive bogie for export to Senegal/ Mali/Sudan

Motive Power

2007-08

Export

Design of meter gauge 14t axle load 1-Co-Co-1 four axle bogie for Tanzania

Motive Power

2007-08

Export

Design of Co-Co trimount fabricated bogie for cape gauge under WDM7 locomotive for export

Motive Power

2007-08

Freight  throughput

Design of Bi-level Auto Car Carrier Wagon type ‘BCACB’

Wagon

2007-08

Freight Throughput

Designs for MBG Loading 1987

B&S

2007-08

Freight Throughput

Design for HM Loading 1995

B&S

2007-08

Freight Throughput

Development of WDM3F 3600 HP locomotive with GE Electrics.

Motive Power

2007-08

Indigenisation

Indigenous development of water  cooled air compressor for EMD locomotives

Motive Power

2007-08

Passenger amenities

Development of 3-phase 1600 HP AC-AC DEMU

Motive Power

2007-08

Passenger amenity

Digital Clock with GPS Synchronization

Telecom

2007-08

Reliability

Study on Characterization of Vanadium mico-alloyed rail steel manufactured by M/s BSP, Bhilai

M&C

2007-08

Reliability

Evaluation of Corrosion Inhibitor Admixture for concrete.

M&C

2007-08

Reliability

Development of traction alternator with Silicone-Rubber based insulation for EMD locomotives

Motive Power

2007-08

Reliability

Design and development of Advance trimount high speed (ATHS) bogie frame for WDM3A  & WDS6Adt  locomotives

Motive Power

2007-08

Reliability

Development of Fully Machined Ductile Iron, Cast Engine Blocks along with Main Bearing Caps for ALCO 251 (16 cylinder) Diesel Engines

Motive Power

2007-08

Reliability

Remote Monitoring and Management of Locomotive and Trains (REMMLOT)

Motive Power

2007-08

Reliability

Modified Motor Suspension Unit Drive System for WAG9/WAP7 class of locomotives, developed for segregation of lubricants used for gear case and DE bearing of MSU.

Elect. Loco.

2007-08

Reliability

Development of new generation protection relays for Mumbai sub-urban for MRVC. Improvement in protection scheme for Mumbai sub-urban area, converted from 1500V DC to 25kV AC

TI

2007-08

Safety

Standardization of Casting parameters of cast manganese Steel (CMS) crossings

M&C

2007-08

Safety

Alternate chemistry for Corrosion Resistance Rail

M&C

2007-08

Safety

Development of TFT LCD Display for Driver’s Cab [Called  “Dials” - Digital into Analogue LCD- Based System] for Diesel Electric Locomotives

Motive Power

2007-08

Safety

Design optimisation to develop light weight HTSC fabricated bogie for twin cab passenger version of HHP locomotive‘

Motive Power

2007-08

Safety

Development of WDP4B 4500 HP locomotive in place of WDP4 locomotive.

Motive Power

2007-08

Safety

Wheel Impact Load Detector

Research

2007-08

Safety

Development of AT welding technologies with three piece moulds and compressed air petrol preheating.

Track Design

2007-08

Safety

1.    Development and trial of   corrosion resistant Ni-Cr-Cu (NCC) Rails.

Track design

2007-08

Safety

Development of Quad cable with conductor dia of 1.4 mm

Telecom

2007-08

Safety

Design for MBG Loading 1987

B&S

2007-08

Standardization

Design of Open Web Girder  (OWG) bridge (underslung type)

B&S

2007-08

Standardization

Design of Pot-PTFE Bearing

B&S

2007-08

Standardization

Design of H-beam sleeper

B&S

2007-08

Standardization

Design of OWG for 25t loading

B&S

2007-08

Standardization

Design of OWG of welded type DFC loading (32.5t axle load)

B&S

2007-08

Computerization

a.  Cheque printing

b. CO-6  & CO-7 register

c. Electronic  Bill passing& linking with executive bill register.

Finance & Accounts

2007-08

Efficiency & Reliability

Development of LED Based HS Lamp.

Traffic

2007-08

Safety

Development of specification for three-axle cast steel Tri-mount Bogie frams & flexi-coil bogie frame and Bolster for BG Locomotives.

M&C

2007-08

Computerisation/Transparency & Accessibility

Computerisation/Transparency & Accessibility

Personnel

2007-08

Safety Development of Design and Drawings for Movable Switch Diamond

Track Design

2007-08

Safety  Development of specification for outsourcing of ultrasonic testing of rail.

Track Design

2007-08

Safety  Development of AT welding technology with  Compressed air petrol preheating and three piece moulds

Track Design

2008-09

Economy

Development of low mean pore size fuel filters to improve the reliability and life of fuel injection equipment as well as the life of the filter itself on ALCo locomotives.

Motive Power

2008-09

Economy

Energy efficient FTTM Blower

Motive Power

2008-09

Efficiency

Development of Cast Steel Wheels for EMU

M&C

2008-09

Efficiency & Passenger Amenities

Increase in passenger carrying capacity of EMU 18 coach EMU 29 Coach MEMU

PS&EMU

2008-09

Freight Throughput

Design for 25 t

B&S

2008-09

Freight Throughput

Design for DFC Loading.

B&S

2008-09

Freight Throughput

Design and development of higher capacity radiator fan for 4500 hp EMD locomotives following successful benchmarking of indigenous fans

Motive Power

2008-09

Freight Throughput

Design & Development of 22.9 t A/L Open Wagon type BOXNHL

Wagon

2008-09

Freight Throughput

Design & Development of 22.9 t A/L covered wagon type BCNHL

Wagon

2008-09

Green Technology

Alternate Fuel

Engine Development

2008-09

Green Technology

Development of Rubber Pads with scrap material

M&C

2008-09

Indigenisation

Indigenous development of complete 3-Phase Electrics and its Controls (except TMs) for WDG Locomotives

Motive Power

2008-09

Indigenization

Development of Indigenous insulation system for Hitachi TMs

Elect. Loco.

2008-09

Passenger amenities

BG DEMU for J&K

Motive power

2008-09

Passenger amenity

Integrated Passenger Information System consisting of Train Indication, Coach Guidance and PC based Announcement System at Railway stations

Telecom

2008-09

Passenger Amenity

True Colour Video-cum-Train Information System

Telecom

2008-09

Reliability

The design, development & commissioning of   supervisory control and data acquisition (SCADA) system to meet special requirements of 25 kV ac traction system on Mumbai suburban section.

TI

2008-09

Reliability

Evolution of Two Reliable Designs of Squirrel Cage Rotors for Three Phase Traction Motors type 6FRA6068 used in Locomotive Applications

Elect. Loco.

2008-09

Reliability

Design & development of High adhesion high speed (HAHS) equaliser less bogie for WDM3D locomotive

Motive Power

2008-09

Reliability

Design of new, reliable and maintenance friendly bogie for WDP1 locomotive

Motive Power

2008-09

Reliability

Up gradation of specification of IGBT-based AC-AC system for 4500 hp locomotive

Motive Power

2008-09

Safety

New corrosion Resistant Rails developed.

M&C

2008-09

Safety

3-coach HS SPART

Motive Power

2008-09

Safety

Specification No. RDSO/SPN/195/2008

Signal

2008-09

Safety

Specification No. RDSO/SPN/196/2009

Signal

2008-09

Safety &  Reliability

Mobile Train Radio Communication System (GSM-R)

Telecom

2008-09

Standardization

Standard drawing for 25t loading – 2008 plate girder welded type

B&S

2008-09

Standardization

Standard drawing for DFC loading (32.5t axle load) plate girder welded type

B&S

2008-09

Throughput Enhancement

Design of Concrete Bridges for 25t loading-2008

B&S

2008-09

Throughput Enhancement

Design of concrete bridges for DFC loading

B&S

2008-09

Throughput Enhancement

Design for HM loading-1995.

B&S

2008-09

aSuccessful implementation of VI CPC  & 405 payment of arrear.

b.100%  payment of salary, arrear, and  misc. payment through Bank.

a.  Sixth pay commission instructions have been successfully implemented within the targeted date i.e. 30.09.2008.This involves change in Computer Programme in CATS which was done successfully in record time.And the Ist installment of arrear of VIth CPC was also made with in targeted time (31.12.2008)

b. Finance Dte has achieved the target of 100% payment of salary, arrear misc. through Bank by Nov-2008

Finance & Accounts

2008-09

Track Laboratory

Field trial to determine lateral and longitudinal ballast resistance (just after tamping).

 TMM

2008-09

Track Laboratory

Field trial to determine Frame resistance Value

 TMM

2008-09

Track Laboratory

Fatigue testing of monoblock PSC sleepers to Drg. No. EDO/T- 2255 for  Dedicated Freight Corridor

 TMM

2008-09

Large Track Machines

Specification and drawings of spare parts of Machines

 TMM

2008-09

Large Track Machines

Detail technical specification on on-track machines

 TMM

2008-09

 Large Track Machines

Rail   Bound   Maintenance  Vehicle  for the Engineering Department   (8 wheeler RBMV)

 TMM

2008-09

 Large Track Machines

Trouble shooting manual

 TMM

2008-09

Large Track Machines

Inspection check list

 TMM

2008-09

Large Track Machines

Maintenance Schedule Manual

TMM

2008-09

Safety

Recruitment  of ASM, ALP and Motormen on IR

Psycho-Technical

2008-09

Computerisation/Transparency & Accessibility

Computerisation/Transparency & Accessibility

Personnel

2008-09

Safety & Reliability Development of Design and Specification of Improved Switch expansion Joint (SEJ)

Track Design

2008-09

Safety & Reliability Development of specification of Improved Rail Pad.

Track Design

2008-12

Safety

Standardization of welding parameters of Flash Butt welding plants

M&C

2009-10

Economy

Development of a specification for more cost effective Thermal Insulation Kit for Exhaust manifold.

Motive Power

2009-10

Efficiency & Reliability 

Development of IGBT propulsion for 3 phase locomotive.

Elect. Loco.

2009-10

Export

Design of 19.5t Flexi float Standard gauge bogie for export to Syria

Motive Power

2009-10

Export

Design of 16.5t axle load Co-Co bogie for Holcim locomotive for export to Sri Lanka

Motive Power

2009-10

Freight Throughput

Designs for DFC loading -2008.

B&S

2009-10

Freight Throughput

Designs for 25 t loading-2008

B&S

2009-10

Green Technology

Coach Illumination with LED light

PS&EMU

2009-10

Indigenisation

Design and development of Indigenous wheel for WDG4 loco

Motive Power

2009-10

Passenger amenities

Design of EMD family WDP4 variant locomotive with Hotel Load capability

Motive Power

2009-10

Passenger Amenities

Standardization of Flooring and Roofing on Railway Stations

Works

2009-10

Passenger Amenities

Development of Satellite Imaging for Rail Navigation (SIMRAN)

Telecom

2009-10

Reliability

Development of Corona wire for converter fed motors.

Elect. Loco.

2009-10

Reliability

Development of Inter-Station Wireless Backup System

Telecom

2009-10

Safety

Development of Channel sleeper

B&S

2009-10

Safety

Development of Fire Retardant Coatings and Mastic Sealing Compound and Metallic Fire Barriers

M&C

2009-10

Safety

Development of EP Assist Brake System

Motive Power

2009-10

Safety

Development of 4500 HP dual cab WDP4D loco.

Motive Power

2009-10

Safety

Development of digital ultrasonic rail testers.

Track Design

2009-10

Safety

Development of specification for ultrasonic rail testing using vehicular system.

Track Design

2009-10

Safety

Reverse Cycle air conditioning system

PS&EMU

2009-10

Safety & Reliability

Development of polymer based gapless lightning arrester for 25 KV AC electric locomotives.

Elect. Loco.

2009-10

Security

IP Based Video Surveillance System

Telecom

2009-10

Security

Explosive Detection and Disposal System

Telecom

2009-10

Standardization

Standard drawing Composite girder welded type for 25t loading 2008

B&S

2009-10

Throughput Enhancement

Design of Concrete Bridges for DFC loading.

B&S

2009-10

Throughput Enhancement

Design of Concrete Bridges for 25t loading-2008

B&S

2009-10

Throughput enhancement

Laboratory measurement of Dynamic Shear Modulus of Fill Soils for use in Railway Track Formations with IIT/Kanpur

Geotechnical Engineering

2009-10

Safety

Soil Nailing for Stabilization of Steep Slopes near Railway Tracks with IIT/Kanpur

Geotechnical Engineering

2009-10

Safety

Guidelines For Application of Jute Geo-Textile In Railway Embankments  And Hill Slopes

Geotechnical Engineering

2009-10

Efficiency

Guidelines For Geotechnical Engineering Organization in Zonal Railways

Geotechnical Engineering

2009-10

Throughput enhancement

Guidelines and Specifications of Design of Formation For Heavy Axle Load

Geotechnical Engineering

2009-10

a.  Issuance of revised PPOs to officers & staff retired between 01.01.2006 to 31.08.2008

Payment through RTGS to Third Parties.

a.   PPOs of all officers & staff retired between 01.01.2006.to 31.08.2008 were revised and issued within targeted time i.e.  31.10.2009

Finance Dte has achieved the target of 100% payment  to 3rd parties &Settlement dues.

Finance & Accounts

2009-10

Passenger Amenities

LED Based Signage System

EM

2009-10

Energy Consevation

Energy Efficient LED Based Luminaire Unit for Street Light and Platform Lighting

EM

2009-10

Energy Consevation

Power Saver in Lighting System

EM

2009-10

Passanger Amenities

Heavy Duty Escalators.

EM

2009-10

Protection of Track in case of obstruction

GR 3.62

Traffic

2009-10

Increase of  Speed over Non Interlocked Points

GR 4.10

Traffic

2009-10

OPERATIONAL EFFICIENCY

Replacement of Guard Box with Light Weight Container

Traffic

2009-10

Large Track Machines

Maintenance Schedule Manual

TMM

2009-10

Large Track Machines

Inspection check list

TMM

2009-10

Large Track Machines

Detail technical specifications of on-track machines

TMM

2009-10

Large Track Machines

Specifications and Drawings of spare parts of machines

TMM

2009-10

Small Track Machines

Rail Profile Measuring Equipment

TMM

2009-10

Small Track Machines 

Cordless Train Speed Logger

TMM

2009-10

Track Laboratory

Enhancement in utilization of the Track Panel Fatigue Testing Machine

TMM

 2009-10

Track Laboratory

Lateral and longitudinal ballast resistance of track in consolidated condition

TMM

2009-10

Safety

Recruitment  of ASM, ALP and Motormen on IR

Psycho-Technical

2009-10

Computerisation/Transparency & Accessibility

Computerisation/Transparency & Accessibility

Personnel

 2009-10  Economy  Field Trial of 22.5T optimized Sleeper  

Track Design

 2009-10  Safety & Reliability  Development of Nylon cord reinforced GRSP  

Track Design

2009-10 Safety Development of digital ultrasonic rail testers.

Track Design

2009-10

Increase in average speed of trains with better braking

Conversion off BOXNHL wagons for to twin pipe air brake system

Wagon

2009-10

Higher axle load Double stack

Container
Double stack Container Flats made fit for 100 kmph with 22T Axle Load

Wagon

2009-10

Availability of wagons having latest design

Issue of Private Wagon Design Approval Policy

Wagon

2010-11

Quality manufacture of wagon

Quality Audit of Wagon Builders

Wagon

2010-11

Efficiency

Development of Head-on-generation (HOG) power supply system for coaches

PS&EMU

2010-11

Efficiency

Development of Electronics Interlocking for Big yards

Signal

2010-11

Export

2300 HP Diesel loco for Sri Lanka Railways.

Motive Power

2010-11

Freight Throughput

Indigenous design development of WDG5 loco wheel.

Motive Power

2010-11

Pay to tare ratio

Design of tank Wagon for LSHS/RFO type ‘BTOH’

Wagon

2010-11

Pay to tare ratio –for Cement and Flyash

Design of Fly ash/ Cement wagon type ‘BCFC’

Wagon

2010-11

Freight Throughput

Designs for 25t loading-2008

B&S

2010-11

Green Technology

Use of Eco Friendly Refrigerant

PS&EMU

2010-11

Green Technology

Hotel load converter

Elect. Loco

2010-11

Green Technology

Development of 6670 KVA transformer with Finalisation of specification for 9000 HP and 12000 HP freight locomotives.

Elect. Loco.

2010-11

New Traffic Segment

Design of Ro-Ro Wagon for Universal Operation type “BTRO”

Wagon

2010-11

Passenger Amenities

NG Diesel Hydraulic Railbus (610 mm Gauge) for Neral - Matheran Section.

Motive Power

2010-11

Passenger Amenities

Development of Wireless Coach Display Information System(WCIDS) on SIMRAN platform

Telecom

2010-11

Reliability

Development of BPAC using UFSBI/ MUX Combiner

Signal

2010-11

Reliability

In situ Rotor Bar Crack Detection in Traction Motors type 6FRA6068 during various maintenance schedule

Elect. Loco.

2010-11

Reliability

Study of the metallurgical and chemical behavior of duplex stainless steel and exlore possibilities for using it as a material for manufacturing superstructure of wagons in place of present ferritic stainless steel of ASTM -409 M grade.

M&C

2010-11

Reliability

RDSO/2009/EL/MS/0384(Rev-‘0’) Modification of loco control circuit for circuit breaker (DJ) opening and panto lowering by BLDJ and ZPT switch in 25 kv conventional locomotive equipped with microprocessor based control and fault diagnostic system (MPCS

Elect. Loco

2010-11

Reliability

Reliability improvement of Turbocharger

Engine Development

2010-11

Reliability

Integrated for main LED Signal (with integrated)

Signal

2010-11

Reliability

Development of DC-DC Converter for track circuit application

Signal

2010-11

Reliability

Development of Universal Fail Safe Block Interface (UFSBI)

Signal

2010-11

Safety

Evaluation of Vibration Signature Analysis for Condition Assessment of Concrete Bridges

B&S

2010-11

Safety

Development of Digital Single & Double Rail Testers

M&C

2010-11

Safety

Design of compact version of wheel set trolley to handle the wheel axle lock situation

Motive Power

2010-11

Safety

Accident site communication system

Telecom

2010-11

Safety

Design of men refuge

B&S

2010-11

Safety & Reliability

Development of Vigilance Control Device for tap changer locos

Elect. Loco.

2010-11

Security

Personal & Baggage Screening System

Telecom

2010-11

Throughput Enhancement

Design of Concrete Bridges for 25t loading-2008

B&S

2010-11

Throughput Enhancement

Design of Open Web Girder bridge for DFC loading

B&S

2010-11

Throughput Enhancement

Design of channel sleeper for DFC loading

B&S

2010-11

Throughput Enhancement

Design of Concrete Bridges for 25t loading-2008

B&S

2010-11

Throughput Enhancement

Design of Concrete Bridges for DFC loading

B&S

2010-11

Throughput Enhancement

Design of Concrete Bridges for 25t loading-2008.

B&S

2010-11

Asset reliability

Basic Library Management System

Geotechnical Engineering

2010-11

Throughput enhancement

Design of formation based on CBR value of sub-grade soil with IIT/Kanpur

Geotechnical Engineering

2010-11

Miscellaneous

Reinforced Earth Design of Embankment and Cuts in Railways with IIT/Kanpur

Geotechnical Engineering

2010-11

a.  E – receipt of service charges.

 b.  E-mail of scanned copy of Service Record to all Gaz. Officers.

 c. Green Organization

d.  SMS Alert

 

a.  Facility related to Inspection, Testing, Consultancy, Loan & Design charges , vendor registration & renewal charges etc  have been started from May-2010

 b. Service records of all gazetted officers were scanned and e mail to all Gaz. Officer in July -2010. 

c.  As  esult of reducing No. of Bill Units from 125 to 30 and payment of Supplementary through Salary Bills.

SMS alert is being sent to all officers, staff, and vendors / contractors whenever any payment is released in their favour. 

Finance & Accounts

2010-11

Green Energy

Wind-solar hybrid power supply for level crossing gates

EM

2010-11

Green Energy

Integrated renewable energy system

EM

2010-11

Reliability & Energy Conservation

Codes of practice, guidelines, etc. for J&K project

EM

2010-11

Passenger Amenities

Code of practice for Adarsh and other stations of IR

EM

2010-11

Large Track Machines

Introduction of RGM on IR

 TMM

2010-11

Large Track Machines

Maintenance Schedule Manual

 TMM

2010-11

Large Track Machines

Inspection check list

 TMM

2010-11

Large Track Machines

Trouble shooting manual

 TMM

2010-11

Large Track Machines

Detail technical specifications of on-track machines

 TMM

2010-11

Large Track Machines

Specifications and Drawings of spare parts of machines

 TMM

2010-11

Small Track Machines

Spoke Trolley Wheel compatible for Digital Axel Counter

 TMM

2010-11

Small Track Machines

Framing of new Specifications and revision of Specifications

 TMM

2010-11

Track Laboratory

Fatigue testing of newly designed monoblock PSC sleepers to Drawing No. RDSO/T-7013 (22.5t axle load)

 TMM

2010-11

Track Laboratory

Fatigue testing of composite sleepers for 2.0 million cycles of loading

 TMM

2010-11

Track Laboratory

Fatigue testing of rail sample in connection with Testing of Rails for flaw growth rate

 TMM

2010-11

Track Laboratory

Fatigue and bending test of joggled fish plate

 TMM

2010-11

Safety

Recruitment  of ASM, ALP and Motormen on IRConsultancy: DMRC, KRCL & DAME

Psycho-Technical

2010-11

 Computerisation/Transparency & Accessibility

 Computerisation/Transparency & Accessibility

 Personnel

2010-11 Safety Development of Forged Junction Rail Track Design
2010-11 Safety & reliability

Revision of Specification of Retro-Reflective Engineering Indicators as per ASTM-D-4956-09.

Track Design
2010-11 Safety & Reliability Design of 1:16 thick web switch with ZU-1-60 asymmetric tongue rail Track Design
2010-11 Safety Development of Drawings for modified Special Bearing plates for   1 in 12 PSC fan shaped layout Track Design
2010-11 Throughput Development of Drawings for 1 :8.5 Symmetrical split derailing switch Track Design
2010-11 Throughput Development of Drawings for 1 :12 derailing switch Track Design
2010-11 Economy Development of technology for in-situ reconditioning of CMS Crossing Track Design
2010-11 Safety & Reliability Field Trial  of Under Sleeper Pads Track Design
2010-11 Safety & Reliability Development of ERC Mk-V Track Design
2010-11 Safety & Reliability Development of Composite GRSP Track Design
2010-11 Throughput Technical scrutiny and inputs for Operation of AC Double Decker Coach on Howrah – Dhanbad section Track Design
2010-11 Consultancy Scrutiny and finalization of Standard Gauge SOD of Air port express Metro Line of DMRC and operation of trains. Track Design

2011-12

Economy

Design of BCNHL wagon with Micro alloyed steel

Wagon

2011-12

Efficiency

Reduction in fuel consumption and emission

Engine Development

2011-12

Quality manufacture of  wagon G 105 Standards

Wagon

2011-12

Efficiency

.Energy efficient AC-DC EMU (Mumbai suburban Area) with forced ventilation system.

PS&EMU

2011-12

Efficiency & Passenger Amenities

Development of Energy Efficient Low Noise & higher capacity Compressor

PS&EMU

2011-12

Efficiency & Reliability

Improvement in ventilation system

PS&EMU

2011-12

Efficiency & Reliability 

Development of DC Traction Motors for NGEF Rakes of Kolkata Metro

Elect. Loco.

2011-12

Freight throughput

Finalisation of specification for 9000 HP and 12000 HP freight  locomotives.

Elect. Loco

2011-12

Freight Throughput

Design & development of 5500 HP WDG5 Diesel locomotive

Motive Power

2011-12

Freight Throughput

Design of frameless wagon for petroleum products

Wagon

2011-12

Freight Throughput

Design of Bi level auto car wagon BCACBM

Wagon

2011-12

Indigenization of Coupler High tensile CBC

Wagon

2011-12

Operational Efficiency BOXNHAM Wagon

Wagon

2011-12

Green Technology

Development of Specification for procurement of  New Generation Power Pack keeping in  mind state-of –the- art emission control and fuel injection system

Motive Power

 2011-12  Quality manufacture of  wagon  G 105 Standards  Wagon

2011-12

Intermodal transport

Road-Railer (Development with M/s Kirloskar Pneumatic Co.)

Wagon

2011-12

Passenger amenities

NG Diesel Hydraulic Railcar (762 mm Gauge) for Kalka-Shimla Section of N. Railway

Motive Power

2011-12

Passenger Amenities

Mobile & Laptop charging facility

PS&EMU

2011-12

Passenger Amenities

Provision of toilets in MEMUs

PS&EMU

2011-12

Passenger Amenities

Passenger Information System Train Location Describer  Board in Coaches

PS&EMU

2011-12

Passenger Amenities & Efficiency

New state-of-the-art air-conditioned rakes for Kolkata  Metro

PS&EMU

2011-12

Passenger Safety

Development of Crashworthy Design of LHB Coachm in accordance with latet EN norms 15227.

Carriage

2011-12

Passenger safety

Development of Fire Retardant material for coaches.

Carriage

2011-12

Reliability

Development of Constant Spring Pressure Brush Holders for Hitachi TMs

Elect. Loco.

2011-12

Reliability

Design modification in 1312 KVA transformer for 25 KV AC EMUs for Mumbai Sub-urban Railways.

Elect. Loco.

2011-12

Reliability

Modification of Exhaust Manifold from existing Three Entry to Modified Single Entry design for ALCO locos fitted with ABB TPR-61Turbocharger to improve its reliability

Motive Power

2011-12

Reliability

Introduction of hybrid bearings in AC crank case motor

Motive Power

2011-12

Reliability

Design of light weight maintenance friendly (LWMF) bogie for passenger version of HHP locomotive

Motive Power

2011-12

Reliability

Introduction of Stainless Steel AC EMU Coaches (Two 9 car rakes)

PS&EMU

2011-12

Reliability & Safety

Flashing Type tail lamp for EMU/MEMU, SLR, Power cars

PS&EMU

2011-12

Safety

Development of Forged Junction Rails:

M&C

2011-12

Safety

Development& Trial of Corrosion resistant NCC rails

M&C

2011-12

Safety

Development of corrosion resistant (Cu-Mo) rails

M&C

2011-12

Safety

Development & Field Trial of 110 UTS Rail

M&C

2011-12

Safety

Development of inter-operable Distributed Power Control System (DPCS) of diesel electric locomotives

Motive power

2011-12

Safety

Ultraportable Track parameter monitoring System

Research

2011-12

Safety

Unmanned LC Gate Warning System ) on SIMRAN platform

Telecom

2011-12

Safety

Gangmen Warning System on SIMRAN platform

Telecom

2011-12

Safety

Development of track based gauge face lubricating system

Track Design

2011-12

Safety, Reliability

Suitability checking of existing superstructure drawings for 25t Loading 2008.

B&S

2011-12

Standardization

Standard Drawing for “Details of skew arrangement of composite  Girder ROBs for 18m,24m,30m and 36m clear spans”.

B&S

2011-12

Standardization

Standard Drawing for Composite girder welded type 36.0m span IRC-6 Loading

B&S

2011-12

Standardization

Design of washing pit line.

B&S

2011-12

Standardization

Drawing of Cribs for Piers used for Temporary Arrangement for 25t Loading

B&S

2011-12

Standardization

The standard drawings for the Restricted head plate girder for 14.4m and 26.8m overall length for use as temporary arrangement.

B&S

2011-12

Throughput Enhancement

Design of 25t axle load Container Wagon ‘BLC25’

Wagon

2011-12

Throughput Enhancement

Design of Concrete Bridges for 25t Loading 2008.

B&S

2011-12

Throughput Enhancement

Design of PSC Slabs for 25t Loading 2008.

B&S

2011–12

Freight Throughput

Design of 25 t A/L Coal Wagon type ‘BOXN 25’

Wagon

2011–12

Brake van using Casnub HS bogie

New Design of brake van using Casnub Bogie (BVCM)

Wagon

2011-12

Asset reliability

Software development for computerized laboratory Management System

Geotechnical Engineering

2011-12

Throughput enhancement

Consultancy for Instrumentation & Monitoring of construction of formation for Field Trial of Formation specifications of Heavy Axle Load” with   IIT/Delhi

Geotechnical Engineering

2011-12

Economy

Project on Reinforced Earth Wall with its Design Procedure and Cost Comparison for Road Over Bridge with Conventional Slopes/ Retaining Walls and Road Over Bridge with Reinforced Earth Walls

Geotechnical Engineering

2011-12

Computerization.

 Salary Audit Register, Work  Register, calculation of Interest of Civil grant.PF outward & inward register have been computerized.

Finance & Accounts

2011-12

Green Energy

Grid Connect Solar Generating System of 10 to 100 KWp

EM

2011-12

Energy Conservation

Double Capped Tubular T5 Fluorescent  lamps, T5 luminaire & Electronic Ballast

EM

2011-12

Reliability 

Fault Tolerant Uninterrupted Power Supply (UPS) System for PRS, UTS, EDP Centers, etc.

EM

2011-12

Efficiency & Reliability

Development of LED based Hand Signal Lamp.

Traffic

2011-12

Large Track Machines

Detail technical specifications of on-track machines

 TMM

2011-12 

Small Track Machines

Revision of specifications

 TMM

2011-12

Small Track Machines

GPS-based Foot Plate inspection device

 TMM

2011-12

Track Laboratory

Fatigue testing of 60 Kg/m rail sample in connection with Testing of Rails for flaw growth rate

 TMM

2011-12

Track Laboratory

Fatigue and bending test of joggled fish plate developed by Engineering Workshop, Sabarmati

 TMM

2011-12

Track Laboratory

Fatigue testing of sample on Rail Track Panel fatigue Testing Equipment

 TMM

2011-12

Track Laboratory

Bending Test of Fish plates under static load

 TMM

2011-12

Track Laboratory

Testing of 60 kg A.T. welded rail having riser

 TMM

2011-12

Track Laboratory

Field trial for validation of equipment for measurement of stress free temperature by force application method

 TMM

2011-12

Safety

Recruitment  of ASM, ALP and Motormen on IRConsultancy: DMRC, MOOPL, KRCL & DAME

Psycho-Technical

2011-12

Safety

Decentralisation of CADAT for screening High Speed Train Drivers

Psycho-Technical

2011-12

Safety

New tests developed in-house.

Psycho-Technical

2011-12

Computerisation/Transparency & Accessibility

Computerisation/Transparency & Accessibility

Personnel

2011-12  Safety & reliability  Revision of Manual  for Flash Butt Welding of Rails Revised-2012)  Track Design
2011-12  Safety & reliability  Development of track based gauge face lubricating system.  Track Design

2011-12

 Safety & reliability  Revision to specification of fish plates (IRST-1-2012) Track Design

2011-12

 Safety & reliability  Design of 1:12 Scissor Cross over with 60 Kg UIC rail with PSC sleepers Track Design

2011-12

 Economy  Development of Weldable CMS Crossing Track Design

2011-12

 Economy  Development of technology for repair/reconditioning of rail top defects Track Design

2011-12

 Economy  Improved SEJ for curves up to 4 degree Track Design

2011-12

Economy Development of Composite Sleepers Track Design

2011-12

Consultancy Scrutiny and finalization of Standard Gauge SOD of BMRC. Track Design

2011-12

Throughput enhancement Schedule of Dimension for Eastern and Western Corridor Track Design

2012-13

Passenger Amenities

Standardisation of ‘Roofing Material for Platform Covering’ and ‘workshop flooring’

Works

2012-13

Standardization

The standard drawings for the Restricted head plate girder for 20.4m overall length for use as temporary arrangement.

B&S

2012-13

Throughput enhancement

Development of Double Decker Coach Design

Carriage

2012-13

Throughput Enhancement

Design of Concrete Bridges for DFC loading

B&S

2012-13

Throughput Enhancement

Design of Concrete Bridges for 25t loading-2008

B&S

2012-13

Standardisation

Procedure for safty certification & technical  clearance of Metro System

UTHS

2012-13

Efficiency & Reliability

Development of LED based Tail Lamp

Traffic

 2012-13

Efficiency & Reliability

Development of Scotch Block

Traffic

2012-13

Large Track Machine

Maintenance schedule manual

 TMM

2012-13

Large Track Machine

Inspection Check List

 TMM

2012-13

Large Track Machine

List of critical spares parts of on-track machines

 TMM

2012-13

Small Track Machines

Framing of new Specifications and revision of Specifications

 TMM

2012-13

Track Laboratory

Fatigue testing of 60 Kg UIC rail sample for flaw growth rate

 TMM

2012-13

Track Laboratory

Validation of rail stresses at head and foot by experimental Stress method

TMM

2012-13

Safety

Recruitment  of ASM, ALP  on IRConsultancy: DMRC, KRCL, DAME, MOOPL & Rapid Metro

Psycho-Technical

2012-13

Green Energy

Provision of Grid Connect Solar Generating System of 100 KWp at railways and production units

EM

2012-13

Passenger Amenities

Design scrutiny and safety inspection of heavy duty escalators.

EM

2012-13

Energy Consevation

UIC-Asia Energy Conservation Project

EM

2012-13

Green Energy

Provision of 10 KWp Solar based power supply with battery backup at roadside stations

EM

2012-13

Passanger Amenities

Provision of 400 nos. heavy duty escalators at important railway stations.

EM

2012-13

Safety

Guidelines for Design & Construction of Tunnels

Geotechnical Engineering

2012-13

Safety

Guidelines for Civil Engineering  Inspection, Maintenance and Safety in existing Tunnels

Geotechnical Engineering

2012-13

Safety

Guidelines for safety in Tunnels during Construction

Geotechnical Engineering

2012-13

Asset reliability

Project for Development of Small Width Vibratory Roller for compaction of earthwork in gauge conversion works and narrow width portion

Geotechnical Engineering

2012-13

Economy Development of Explosive Depth Hardened (EDH) CMS Crossing Track Design

2012-13

Safety Revision of ‘Specification for fusion welding of rails by Alumino-thermic process, IRST-19’. Track Design

2012-13

Safety Revision of ‘Manual  for fusion welding of rails by Alumino-thermic process, 1998 Track Design

2012-13

Safety Revision & printing of ‘USFD Manual’ Track Design

2012-13

Safety Development of AT welding technology with Compressed air petrol preheating, three piece moulds and Automatic tapping thimble. Track Design

2012-13

Safety

Revision of specification for ultrasonic rail testing on outsourcing basis

Track Design

2012-13

Safety

Revision of specification for ultrasonic rail testing on outsourcing basis

Track Design

2012-13

Consultancy Scrutiny and finalization of Standard Gauge SOD of Chennai Metro(CMRL) Track Design

2012-13

Fuel efficiency Technical specification for fuel cell assisted APU system for diesel-electric locomotives Motive Power

2012-13

Indigenisation

Revision of specification for traction motor roller suspension bearings used on BG DE locomotives

Motive Power

2012-13

 Increase vendor base

Revision of specification for fluoro-elastomeric cables

Motive Power

2012-13

Quality control

STR for traction motor roller suspension bearing tubes with components for BG Diesel - Electric locomotives (ALCo & HHP both) and DEMUs

Motive Power

2012-13

Cost reduction

Specification for Guidance for Optimised Loco Driving (GOLD)

 Motive Power

2012-13

Reliability

Instructions for storage, handling and testing of Traction Motor speed sensors used in 4000/4500hp HHP locomotives

Motive Power

2012-13

 Fuel efficiency

Revision of specification for Three Phase AC-AC transmission system & associated control equipment for 1600HP diesel electric multiple unit.

 Motive Power

2012-13

Reliability

Instruction Bulletin on problem of frequent failures of TCC blower motor Contactors in ECC#1 panel of HHP locomotive

 Motive Power

2012-13

Reliability

Revision of Technical specification for supply of AC-AC Traction Control System for Dual cab 4500HP WDG4D/WDP4D Diesel- Electric Locomotives 

 Motive Power

2012-13

 Increase vendor base

Revision of Technical specification of DC traction Motors used in ALCo locomotives

 Motive Power

2012-13

Indigenization

Development of computerised LCC (CLCC)

 Motive Power

2012-13

Throughput Enhancement DPCS Trial with Brake Interface Unit in Long Haul Train Operation Motive Power

2012-13

Throughput Enhancement

Hotel load feature in WDP4B locomotives nos. 40001 & 40003 on  Garib Rath rakes

Motive Power

2012-13

 Reliability Improvement in features and functionality of Microprocessor based Traction Control System of ALCo locos

Motive Power

2012-13

 Reliability

Measures to reduce failure of Traction Motor speed sensors used in 4000/4500hp HHP locomotives

Motive Power

2012-13

 Safety

Specification on DIALS – (Digital Into Analog LCD- based System)

Motive Power

2012-13

 Reliability

Revision of specification of  Fuel Level Sensor for Diesel Electric locomotives Locomotives

Motive Power

2012-13

 Reliability/ Safety Procurement and fitment of disc brake system on one WDP4D locomotive

Motive Power

2012-13

 Reliability/ Safety Stress investigation and fatigue testing of HTSC (Fab-II) locomotive bogie frame 

Motive Power 

2012-13

 Safety Conversion of WDM3D and WDG3A locomotive bogies in to equiliserless bogies

Motive Power

2012-13

Safety 3-coach BG Diesel-Hydraulic HS SPART fitted with M/s SAN’s powerpack (Voith transmission)

Motive Power

2012-13

Reliability

Structural audit of 140 Tonne break down crane of MGS & BSP based crane

Motive Power

2012-13

Safety

Technical specification for Light Weight Electric Tools.

Motive Power

2012-13

Safety Technical specification for Inflatable Air bags

Motive Power

2012-13

Passenger amenities High Speed BG DEMU on LHB platform

Motive Power

2012-13

Safety

Technical specification of Hydraulic Rescue Device (HRD).

Motive Power

2012-13

Indigenization Development of HHP Crankshaft Through M/s Bharat Forge (16 Cylinder EMD two piece)

Motive Power 

2012-13

Reliability Implementation of FEV recommendation

Motive Power

2012-13

Cost reduction Development of additional sources of valve, Auto drains for diesel and electric locomotives application

Motive Power

2012-13

Cost reduction Development of additional sources of Brake Block, ‘L’ Type Composition, ALCo & Electric Locomotives

Motive Power

2012-13

Freight Throughput Operation trial of long haul train (Python trial) hauling by two WDG3A (MU) Diesel locomotives fitted with wireless Distributed Power Control System and WAG7 (MU) Electric locomotives fitted with wireless Distributed Power Control System

Motive Power

2012-13

Cost reduction Development of additional source for upgraded compressor.

Motive Power

2012-13

Interchangeability Interchangeability in spares of upgraded compressor.

Motive Power

2012-13

Reliability Maintenance instructions for water cooled compressor to reduce failures.

Motive Power

2012-13

Miscellaneous Incorporation of qualifying quantity of part II approval of MP items.

Motive Power

2012-13

Cost reduction Development of additional source for Spares Upgraded for compressor / expressor, ALCO Locomotives.

Motive Power

2012-13

Cost reduction Up-gradation of source for Valve, Air flow measuring  and Indicator Air flow, ALCo & Electric locomotives

Motive Power

2012-13

Cost reduction Up-gradation of source for Spares for compressor / expressor, ALCO Locomotives

Motive Power

2012-13

Cost reduction Up-gradation of source for Spares Upgraded for compressor / expressor, ALCO Locomotives

Motive Power

2008-13 Safety Amendments in IRSOD, BG- 2004 Track Design
2008-13 Mobility & Throughput enhancement Scrutiny and vetting of speed certificates. Track Design

2013-14

(upto Dec. 2013) Tentative

Safety

Recruitment  of ASM, ALP  on IRConsultancy: DMRC, KRCL, MOOPL & CMRL

 Psycho-Technical

2013-14

Passenger Amenities

Provision of 400 nos. Elevators at important railway stations

EM

2013-14

Energy Consevation

Platform Lighting Automation System

EM

2013-14

Safety & Reliability

Scrutiny of Tunnel Ventilation system (T-80)

EM

2013-14

Safety & Reliability

Scrutiny of Tunnel Ventilation (T-1 and T-3)

EM

2013-14

Safety & Reliability

Tunnel Ventilation Guidelines

EM

2013-14

Safety & Energy Consevation

Illumination Norms for coaching and freight depots

EM

2013-14

Energy Management

IR-UNDP project - Energy Management, Conservation and Efficiency

EM

2013-14

Green Energy

Provision of 500 KWp Grid Connect Solar Generating Systems on IR

EM

2013-14 Economy

Grooved Rubber sole plates (GRSP) with horn for turnouts

Track Design
2013-14 Consultancy Scrutiny and finalization of SOD of Gurgaon Metro (RMGL) Track Design
2013-14 Reliability, Economy Review of Design of Spring Setting Device(SSD) Track Design
2013-14

Safety, Economy

Finalization of Drawing for Combination SEJ Track Design
2013-14

Throughput & Economy

Development of Ballastless Track with Indigenous Fastening System (BLT-IFS) including tunnels and viaducts Track Design
2013-14 Safety & Reliability Revision in Specification (IRS-T-44) of GFN-66 Insulating Liners Track Design
2013-14 Safety & Reliability Revision in Specification of Metal Liners Track Design
2013-14

Throughput

Design of Wider Sleeper using more concrete & less steel for 25T axle load Track Design
2013-14 Safety & Reliability Development of 10mm thick Composite GRSP for 25t sleeper assembly Track Design
2013-14

Consultancy

UIC Asia project on ‘Optimisation of Sleeper Design in collaboration with CHARMEC Sweden. Track Design
2013-14 Safety & Reliability Development of Improved Toe Load J-Clip Track Design
 2013-14 Throughput  Design & development of 25t sleeper along with fastening system  Track Design
 2013-14  Throughput  Design & development of 32.5t sleeper along with fastening system  Track Design
 2013-14  Safety & Reliability  Development of Thermoplastic Elastomer Pads  Track Design
 2013-14  Throughput   Revision of Specification of PSC Sleeper  Track Design
2013-14 Higher  Throughput Design & development of high pay to tare ratio 25T Gondola wagon

Wagon

2013-14 Safety 4500hp WDG4D Locomotive

Motive Power

2013-14 Freight Throughput 5500hp WDG5 locomotive

Motive Power

2013-14 Cost reduction Multi-Genset Locomotive

Motive Power

2013-14 Cost reduction  Up-gradation of source for valve, Auto drain for diesel and electric locomotives application.

Motive Power

2013-14 Indigenization Improvement in design of indigenous water cooled compressor.

Motive Power

2013-14 Cost reduction Development of additional sources of Brake blocks, High Friction, EMD locomotives

Motive Power

2013-14 Safety Development of EP Assist Brake System for Diesel and Electric Locomotives application compatible with EP Assist Brake System on Coaches

Motive Power

2013-14 Cost reduction Development of HHP Crankshaft Through M/s CSR Ziyang, China (16 Cylinder EMD single piece)

Motive Power

 

For Further information, please click directorate link provided against each project or visit the concerned directorate web page.

 



Source : WELCOME TO RDSO CMS Team Last Reviewed on: 22-03-2014  

  Site Map | Contact Us | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.