Financial Year
|
Broad Area of Achievement
|
Title of Achievement
|
Directorate
|
2007-08
|
Crew comfort
|
Development of Cab Air Conditioning System for Diesel Electric Locos
|
Motive Power
|
2007-08
|
Economy
|
Conversion of cast HTSC truck frame of HHP (EMD) locomotive in to fabricated design
|
Motive Power
|
2007-08
|
Efficiency
|
Development of hard facing electrodes for reconditioning of points and crossings.
|
M&C
|
2007-08
|
Efficiency
|
Development of Flux cored wire for reclamation of Tie Tamping Tools.
|
M&C
|
2007-08
|
Efficiency & Reliability
|
Control Communication Equipment for OFC Section
|
Telecom
|
2007-08
|
Efficiency & Reliability
|
Integrated Way-Station Control Communication Equipment
|
Telecom
|
2007-08
|
Efficiency & Reliability
|
Re-engineering of Stators of Traction Motors type 6FRA6068 making it more reliable.
|
Elect. Loco.
|
2007-08
|
Export
|
Design & develop-ment of 1400hp/ 2300hp Cape gauge & meter gauge loco-motive bogie for export to Senegal/ Mali/Sudan
|
Motive Power
|
2007-08
|
Export
|
Design of meter gauge 14t axle load 1-Co-Co-1 four axle bogie for Tanzania
|
Motive Power
|
2007-08
|
Export
|
Design of Co-Co trimount fabricated bogie for cape gauge under WDM7 locomotive for export
|
Motive Power
|
2007-08
|
Freight throughput
|
Design of Bi-level Auto Car Carrier Wagon type ‘BCACB’
|
Wagon
|
2007-08
|
Freight Throughput
|
Designs for MBG Loading 1987
|
B&S
|
2007-08
|
Freight Throughput
|
Design for HM Loading 1995
|
B&S
|
2007-08
|
Freight Throughput
|
Development of WDM3F 3600 HP locomotive with GE Electrics.
|
Motive Power
|
2007-08
|
Indigenisation
|
Indigenous development of water cooled air compressor for EMD locomotives
|
Motive Power
|
2007-08
|
Passenger amenities
|
Development of 3-phase 1600 HP AC-AC DEMU
|
Motive Power
|
2007-08
|
Passenger amenity
|
Digital Clock with GPS Synchronization
|
Telecom
|
2007-08
|
Reliability
|
Study on Characterization of Vanadium mico-alloyed rail steel manufactured by M/s BSP, Bhilai
|
M&C
|
2007-08
|
Reliability
|
Evaluation of Corrosion Inhibitor Admixture for concrete.
|
M&C
|
2007-08
|
Reliability
|
Development of traction alternator with Silicone-Rubber based insulation for EMD locomotives
|
Motive Power
|
2007-08
|
Reliability
|
Design and development of Advance trimount high speed (ATHS) bogie frame for WDM3A & WDS6Adt locomotives
|
Motive Power
|
2007-08
|
Reliability
|
Development of Fully Machined Ductile Iron, Cast Engine Blocks along with Main Bearing Caps for ALCO 251 (16 cylinder) Diesel Engines
|
Motive Power
|
2007-08
|
Reliability
|
Remote Monitoring and Management of Locomotive and Trains (REMMLOT)
|
Motive Power
|
2007-08
|
Reliability
|
Modified Motor Suspension Unit Drive System for WAG9/WAP7 class of locomotives, developed for segregation of lubricants used for gear case and DE bearing of MSU.
|
Elect. Loco.
|
2007-08
|
Reliability
|
Development of new generation protection relays for Mumbai sub-urban for MRVC. Improvement in protection scheme for Mumbai sub-urban area, converted from 1500V DC to 25kV AC
|
TI
|
2007-08
|
Safety
|
Standardization of Casting parameters of cast manganese Steel (CMS) crossings
|
M&C
|
2007-08
|
Safety
|
Alternate chemistry for Corrosion Resistance Rail
|
M&C
|
2007-08
|
Safety
|
Development of TFT LCD Display for Driver’s Cab [Called “Dials” - Digital into Analogue LCD- Based System] for Diesel Electric Locomotives
|
Motive Power
|
2007-08
|
Safety
|
Design optimisation to develop light weight HTSC fabricated bogie for twin cab passenger version of HHP locomotive‘
|
Motive Power
|
2007-08
|
Safety
|
Development of WDP4B 4500 HP locomotive in place of WDP4 locomotive.
|
Motive Power
|
2007-08
|
Safety
|
Wheel Impact Load Detector
|
Research
|
2007-08
|
Safety
|
Development of AT welding technologies with three piece moulds and compressed air petrol preheating.
|
Track Design
|
2007-08
|
Safety
|
1. Development and trial of corrosion resistant Ni-Cr-Cu (NCC) Rails.
|
Track design
|
2007-08
|
Safety
|
Development of Quad cable with conductor dia of 1.4 mm
|
Telecom
|
2007-08
|
Safety
|
Design for MBG Loading 1987
|
B&S
|
2007-08
|
Standardization
|
Design of Open Web Girder (OWG) bridge (underslung type)
|
B&S
|
2007-08
|
Standardization
|
Design of Pot-PTFE Bearing
|
B&S
|
2007-08
|
Standardization
|
Design of H-beam sleeper
|
B&S
|
2007-08
|
Standardization
|
Design of OWG for 25t loading
|
B&S
|
2007-08
|
Standardization
|
Design of OWG of welded type DFC loading (32.5t axle load)
|
B&S
|
2007-08
|
Computerization
|
a. Cheque printing
b. CO-6 & CO-7 register
c. Electronic Bill passing& linking with executive bill register.
|
Finance & Accounts
|
2007-08
|
Efficiency & Reliability
|
Development of LED Based HS Lamp.
|
Traffic
|
2007-08
|
Safety
|
Development of specification for three-axle cast steel Tri-mount Bogie frams & flexi-coil bogie frame and Bolster for BG Locomotives.
|
M&C
|
2007-08
|
Computerisation/Transparency & Accessibility
|
Computerisation/Transparency & Accessibility
|
Personnel
|
2007-08
|
Safety |
Development of Design and Drawings for Movable Switch Diamond |
Track Design
|
2007-08
|
Safety |
Development of specification for outsourcing of ultrasonic testing of rail. |
Track Design
|
2007-08
|
Safety |
Development of AT welding technology with Compressed air petrol preheating and three piece moulds |
Track Design
|
2008-09
|
Economy
|
Development of low mean pore size fuel filters to improve the reliability and life of fuel injection equipment as well as the life of the filter itself on ALCo locomotives.
|
Motive Power
|
2008-09
|
Economy
|
Energy efficient FTTM Blower
|
Motive Power
|
2008-09
|
Efficiency
|
Development of Cast Steel Wheels for EMU
|
M&C
|
2008-09
|
Efficiency & Passenger Amenities
|
Increase in passenger carrying capacity of EMU 18 coach EMU 29 Coach MEMU
|
PS&EMU
|
2008-09
|
Freight Throughput
|
Design for 25 t
|
B&S
|
2008-09
|
Freight Throughput
|
Design for DFC Loading.
|
B&S
|
2008-09
|
Freight Throughput
|
Design and development of higher capacity radiator fan for 4500 hp EMD locomotives following successful benchmarking of indigenous fans
|
Motive Power
|
2008-09
|
Freight Throughput
|
Design & Development of 22.9 t A/L Open Wagon type BOXNHL
|
Wagon
|
2008-09
|
Freight Throughput
|
Design & Development of 22.9 t A/L covered wagon type BCNHL
|
Wagon
|
2008-09
|
Green Technology
|
Alternate Fuel
|
Engine Development
|
2008-09
|
Green Technology
|
Development of Rubber Pads with scrap material
|
M&C
|
2008-09
|
Indigenisation
|
Indigenous development of complete 3-Phase Electrics and its Controls (except TMs) for WDG Locomotives
|
Motive Power
|
2008-09
|
Indigenization
|
Development of Indigenous insulation system for Hitachi TMs
|
Elect. Loco.
|
2008-09
|
Passenger amenities
|
BG DEMU for J&K
|
Motive power
|
2008-09
|
Passenger amenity
|
Integrated Passenger Information System consisting of Train Indication, Coach Guidance and PC based Announcement System at Railway stations
|
Telecom
|
2008-09
|
Passenger Amenity
|
True Colour Video-cum-Train Information System
|
Telecom
|
2008-09
|
Reliability
|
The design, development & commissioning of supervisory control and data acquisition (SCADA) system to meet special requirements of 25 kV ac traction system on Mumbai suburban section.
|
TI
|
2008-09
|
Reliability
|
Evolution of Two Reliable Designs of Squirrel Cage Rotors for Three Phase Traction Motors type 6FRA6068 used in Locomotive Applications
|
Elect. Loco.
|
2008-09
|
Reliability
|
Design & development of High adhesion high speed (HAHS) equaliser less bogie for WDM3D locomotive
|
Motive Power
|
2008-09
|
Reliability
|
Design of new, reliable and maintenance friendly bogie for WDP1 locomotive
|
Motive Power
|
2008-09
|
Reliability
|
Up gradation of specification of IGBT-based AC-AC system for 4500 hp locomotive
|
Motive Power
|
2008-09
|
Safety
|
New corrosion Resistant Rails developed.
|
M&C
|
2008-09
|
Safety
|
3-coach HS SPART
|
Motive Power
|
2008-09
|
Safety
|
Specification No. RDSO/SPN/195/2008
|
Signal
|
2008-09
|
Safety
|
Specification No. RDSO/SPN/196/2009
|
Signal
|
2008-09
|
Safety & Reliability
|
Mobile Train Radio Communication System (GSM-R)
|
Telecom
|
2008-09
|
Standardization
|
Standard drawing for 25t loading – 2008 plate girder welded type
|
B&S
|
2008-09
|
Standardization
|
Standard drawing for DFC loading (32.5t axle load) plate girder welded type
|
B&S
|
2008-09
|
Throughput Enhancement
|
Design of Concrete Bridges for 25t loading-2008
|
B&S
|
2008-09
|
Throughput Enhancement
|
Design of concrete bridges for DFC loading
|
B&S
|
2008-09
|
Throughput Enhancement
|
Design for HM loading-1995.
|
B&S
|
2008-09
|
aSuccessful implementation of VI CPC & 405 payment of arrear.
b.100% payment of salary, arrear, and misc. payment through Bank.
|
a. Sixth pay commission instructions have been successfully implemented within the targeted date i.e. 30.09.2008.This involves change in Computer Programme in CATS which was done successfully in record time.And the Ist installment of arrear of VIth CPC was also made with in targeted time (31.12.2008)
b. Finance Dte has achieved the target of 100% payment of salary, arrear misc. through Bank by Nov-2008
|
Finance & Accounts
|
2008-09
|
Track Laboratory
|
Field trial to determine lateral and longitudinal ballast resistance (just after tamping).
|
TMM
|
2008-09
|
Track Laboratory
|
Field trial to determine Frame resistance Value
|
TMM
|
2008-09
|
Track Laboratory
|
Fatigue testing of monoblock PSC sleepers to Drg. No. EDO/T- 2255 for Dedicated Freight Corridor
|
TMM
|
2008-09
|
Large Track Machines
|
Specification and drawings of spare parts of Machines
|
TMM
|
2008-09
|
Large Track Machines
|
Detail technical specification on on-track machines
|
TMM
|
2008-09
|
Large Track Machines
|
Rail Bound Maintenance Vehicle for the Engineering Department (8 wheeler RBMV)
|
TMM
|
2008-09
|
Large Track Machines
|
Trouble shooting manual
|
TMM
|
2008-09
|
Large Track Machines
|
Inspection check list
|
TMM
|
2008-09
|
Large Track Machines
|
Maintenance Schedule Manual
|
TMM
|
2008-09
|
Safety
|
Recruitment of ASM, ALP and Motormen on IR
|
Psycho-Technical
|
2008-09
|
Computerisation/Transparency & Accessibility
|
Computerisation/Transparency & Accessibility
|
Personnel
|
2008-09
|
Safety & Reliability |
Development of Design and Specification of Improved Switch expansion Joint (SEJ) |
Track Design
|
2008-09
|
Safety & Reliability |
Development of specification of Improved Rail Pad. |
Track Design
|
2008-12
|
Safety
|
Standardization of welding parameters of Flash Butt welding plants
|
M&C
|
2009-10
|
Economy
|
Development of a specification for more cost effective Thermal Insulation Kit for Exhaust manifold.
|
Motive Power
|
2009-10
|
Efficiency & Reliability
|
Development of IGBT propulsion for 3 phase locomotive.
|
Elect. Loco.
|
2009-10
|
Export
|
Design of 19.5t Flexi float Standard gauge bogie for export to Syria
|
Motive Power
|
2009-10
|
Export
|
Design of 16.5t axle load Co-Co bogie for Holcim locomotive for export to Sri Lanka
|
Motive Power
|
2009-10
|
Freight Throughput
|
Designs for DFC loading -2008.
|
B&S
|
2009-10
|
Freight Throughput
|
Designs for 25 t loading-2008
|
B&S
|
2009-10
|
Green Technology
|
Coach Illumination with LED light
|
PS&EMU
|
2009-10
|
Indigenisation
|
Design and development of Indigenous wheel for WDG4 loco
|
Motive Power
|
2009-10
|
Passenger amenities
|
Design of EMD family WDP4 variant locomotive with Hotel Load capability
|
Motive Power
|
2009-10
|
Passenger Amenities
|
Standardization of Flooring and Roofing on Railway Stations
|
Works
|
2009-10
|
Passenger Amenities
|
Development of Satellite Imaging for Rail Navigation (SIMRAN)
|
Telecom
|
2009-10
|
Reliability
|
Development of Corona wire for converter fed motors.
|
Elect. Loco.
|
2009-10
|
Reliability
|
Development of Inter-Station Wireless Backup System
|
Telecom
|
2009-10
|
Safety
|
Development of Channel sleeper
|
B&S
|
2009-10
|
Safety
|
Development of Fire Retardant Coatings and Mastic Sealing Compound and Metallic Fire Barriers
|
M&C
|
2009-10
|
Safety
|
Development of EP Assist Brake System
|
Motive Power
|
2009-10
|
Safety
|
Development of 4500 HP dual cab WDP4D loco.
|
Motive Power
|
2009-10
|
Safety
|
Development of digital ultrasonic rail testers.
|
Track Design
|
2009-10
|
Safety
|
Development of specification for ultrasonic rail testing using vehicular system.
|
Track Design
|
2009-10
|
Safety
|
Reverse Cycle air conditioning system
|
PS&EMU
|
2009-10
|
Safety & Reliability
|
Development of polymer based gapless lightning arrester for 25 KV AC electric locomotives.
|
Elect. Loco.
|
2009-10
|
Security
|
IP Based Video Surveillance System
|
Telecom
|
2009-10
|
Security
|
Explosive Detection and Disposal System
|
Telecom
|
2009-10
|
Standardization
|
Standard drawing Composite girder welded type for 25t loading 2008
|
B&S
|
2009-10
|
Throughput Enhancement
|
Design of Concrete Bridges for DFC loading.
|
B&S
|
2009-10
|
Throughput Enhancement
|
Design of Concrete Bridges for 25t loading-2008
|
B&S
|
2009-10
|
Throughput enhancement
|
Laboratory measurement of Dynamic Shear Modulus of Fill Soils for use in Railway Track Formations with IIT/Kanpur
|
Geotechnical Engineering
|
2009-10
|
Safety
|
Soil Nailing for Stabilization of Steep Slopes near Railway Tracks with IIT/Kanpur
|
Geotechnical Engineering
|
2009-10
|
Safety
|
Guidelines For Application of Jute Geo-Textile In Railway Embankments And Hill Slopes
|
Geotechnical Engineering
|
2009-10
|
Efficiency
|
Guidelines For Geotechnical Engineering Organization in Zonal Railways
|
Geotechnical Engineering
|
2009-10
|
Throughput enhancement
|
Guidelines and Specifications of Design of Formation For Heavy Axle Load
|
Geotechnical Engineering
|
2009-10
|
a. Issuance of revised PPOs to officers & staff retired between 01.01.2006 to 31.08.2008
Payment through RTGS to Third Parties.
|
a. PPOs of all officers & staff retired between 01.01.2006.to 31.08.2008 were revised and issued within targeted time i.e. 31.10.2009
Finance Dte has achieved the target of 100% payment to 3rd parties &Settlement dues.
|
Finance & Accounts
|
2009-10
|
Passenger Amenities
|
LED Based Signage System
|
EM
|
2009-10
|
Energy Consevation
|
Energy Efficient LED Based Luminaire Unit for Street Light and Platform Lighting
|
EM
|
2009-10
|
Energy Consevation
|
Power Saver in Lighting System
|
EM
|
2009-10
|
Passanger Amenities
|
Heavy Duty Escalators.
|
EM
|
2009-10
|
Protection of Track in case of obstruction
|
GR 3.62
|
Traffic
|
2009-10
|
Increase of Speed over Non Interlocked Points
|
GR 4.10
|
Traffic
|
2009-10
|
OPERATIONAL EFFICIENCY
|
Replacement of Guard Box with Light Weight Container
|
Traffic
|
2009-10
|
Large Track Machines
|
Maintenance Schedule Manual
|
TMM
|
2009-10
|
Large Track Machines
|
Inspection check list
|
TMM
|
2009-10
|
Large Track Machines
|
Detail technical specifications of on-track machines
|
TMM
|
2009-10
|
Large Track Machines
|
Specifications and Drawings of spare parts of machines
|
TMM
|
2009-10
|
Small Track Machines
|
Rail Profile Measuring Equipment
|
TMM
|
2009-10
|
Small Track Machines
|
Cordless Train Speed Logger
|
TMM
|
2009-10
|
Track Laboratory
|
Enhancement in utilization of the Track Panel Fatigue Testing Machine
|
TMM
|
2009-10
|
Track Laboratory
|
Lateral and longitudinal ballast resistance of track in consolidated condition
|
TMM
|
2009-10
|
Safety
|
Recruitment of ASM, ALP and Motormen on IR
|
Psycho-Technical
|
2009-10
|
Computerisation/Transparency & Accessibility
|
Computerisation/Transparency & Accessibility
|
Personnel
|
2009-10 |
Economy |
Field Trial of 22.5T optimized Sleeper |
Track Design
|
2009-10 |
Safety & Reliability |
Development of Nylon cord reinforced GRSP |
Track Design
|
2009-10 |
Safety |
Development of digital ultrasonic rail testers. |
Track Design
|
2009-10 |
Increase in average speed of trains with better braking
|
Conversion off BOXNHL wagons for to twin pipe air brake system |
Wagon
|
2009-10 |
Higher axle load Double stack
Container |
Double stack Container Flats made fit for 100 kmph with 22T Axle Load |
Wagon
|
2009-10 |
Availability of wagons having latest design
|
Issue of Private Wagon Design Approval Policy
|
Wagon
|
2010-11
|
Quality manufacture of wagon
|
Quality Audit of Wagon Builders |
Wagon
|
2010-11
|
Efficiency
|
Development of Head-on-generation (HOG) power supply system for coaches
|
PS&EMU
|
2010-11
|
Efficiency
|
Development of Electronics Interlocking for Big yards
|
Signal
|
2010-11
|
Export
|
2300 HP Diesel loco for Sri Lanka Railways.
|
Motive Power
|
2010-11
|
Freight Throughput
|
Indigenous design development of WDG5 loco wheel.
|
Motive Power
|
2010-11
|
Pay to tare ratio
|
Design of tank Wagon for LSHS/RFO type ‘BTOH’
|
Wagon
|
2010-11
|
Pay to tare ratio –for Cement and Flyash
|
Design of Fly ash/ Cement wagon type ‘BCFC’
|
Wagon
|
2010-11
|
Freight Throughput
|
Designs for 25t loading-2008
|
B&S
|
2010-11
|
Green Technology
|
Use of Eco Friendly Refrigerant
|
PS&EMU
|
2010-11
|
Green Technology
|
Hotel load converter
|
Elect. Loco
|
2010-11
|
Green Technology
|
Development of 6670 KVA transformer with Finalisation of specification for 9000 HP and 12000 HP freight locomotives.
|
Elect. Loco.
|
2010-11
|
New Traffic Segment
|
Design of Ro-Ro Wagon for Universal Operation type “BTRO”
|
Wagon
|
2010-11
|
Passenger Amenities
|
NG Diesel Hydraulic Railbus (610 mm Gauge) for Neral - Matheran Section.
|
Motive Power
|
2010-11
|
Passenger Amenities
|
Development of Wireless Coach Display Information System(WCIDS) on SIMRAN platform
|
Telecom
|
2010-11
|
Reliability
|
Development of BPAC using UFSBI/ MUX Combiner
|
Signal
|
2010-11
|
Reliability
|
In situ Rotor Bar Crack Detection in Traction Motors type 6FRA6068 during various maintenance schedule
|
Elect. Loco.
|
2010-11
|
Reliability
|
Study of the metallurgical and chemical behavior of duplex stainless steel and exlore possibilities for using it as a material for manufacturing superstructure of wagons in place of present ferritic stainless steel of ASTM -409 M grade.
|
M&C
|
2010-11
|
Reliability
|
RDSO/2009/EL/MS/0384(Rev-‘0’) Modification of loco control circuit for circuit breaker (DJ) opening and panto lowering by BLDJ and ZPT switch in 25 kv conventional locomotive equipped with microprocessor based control and fault diagnostic system (MPCS
|
Elect. Loco
|
2010-11
|
Reliability
|
Reliability improvement of Turbocharger
|
Engine Development
|
2010-11
|
Reliability
|
Integrated for main LED Signal (with integrated)
|
Signal
|
2010-11
|
Reliability
|
Development of DC-DC Converter for track circuit application
|
Signal
|
2010-11
|
Reliability
|
Development of Universal Fail Safe Block Interface (UFSBI)
|
Signal
|
2010-11
|
Safety
|
Evaluation of Vibration Signature Analysis for Condition Assessment of Concrete Bridges
|
B&S
|
2010-11
|
Safety
|
Development of Digital Single & Double Rail Testers
|
M&C
|
2010-11
|
Safety
|
Design of compact version of wheel set trolley to handle the wheel axle lock situation
|
Motive Power
|
2010-11
|
Safety
|
Accident site communication system
|
Telecom
|
2010-11
|
Safety
|
Design of men refuge
|
B&S
|
2010-11
|
Safety & Reliability
|
Development of Vigilance Control Device for tap changer locos
|
Elect. Loco.
|
2010-11
|
Security
|
Personal & Baggage Screening System
|
Telecom
|
2010-11
|
Throughput Enhancement
|
Design of Concrete Bridges for 25t loading-2008
|
B&S
|
2010-11
|
Throughput Enhancement
|
Design of Open Web Girder bridge for DFC loading
|
B&S
|
2010-11
|
Throughput Enhancement
|
Design of channel sleeper for DFC loading
|
B&S
|
2010-11
|
Throughput Enhancement
|
Design of Concrete Bridges for 25t loading-2008
|
B&S
|
2010-11
|
Throughput Enhancement
|
Design of Concrete Bridges for DFC loading
|
B&S
|
2010-11
|
Throughput Enhancement
|
Design of Concrete Bridges for 25t loading-2008.
|
B&S
|
2010-11
|
Asset reliability
|
|