ACHIEVEMENTS DURING 2012-2013

 

Sl. No.

Financial Year

Broad Area of Achievement

Title of Achievement

Description of achievement

Likely Benefit

Current Status of Implementation

1.

2012-13

Large Track Machine

Maintenance schedule manual

To improve maintenance, maintenance schedule manual of Unimat 4S has been prepared and issued. This will ensure uniform maintenance practices over all the Zonal Railways and would also help in improving the availability of these machines.

Proper maintenance & reduced breakdown of On-Track Machines

Implemented on Indian Railways

2.

2012-13

Large Track Machine

Inspection Check List

To avoid failure of On-Track Machines in block section, it is essential that proper inspection is carried out by the inspecting official. For this purpose detailed inspection check list of Unimat 4S has been prepared and issued to Zonal Railways.

Proper inspection by field supervisors and officers for upkeep of on-track machines

Implemented on Indian Railways

3.

2012-13

Large Track Machine

List of critical spares parts of on-track machines

To reduce the down time of the machines due to failure of spares, the list of critical spares of continuous tamping machine, tamping express machine and worksite tamping machine have been revised and issued to Zonal Railways.

 

Issued as a guidelines for purchasing spares for on-track machines

Implemented on Indian Railways

4.

2012-13

Small Track Machines

Framing of new Specifications and revision of Specifications

 

i)Cordless train speed logger

ii)Electronic Toe Load Measuring Device (ETLMD)

iii)Continuous Rail Thermometers (CRT)

 iv)  Abrasive Rail Cutter

 v)  GPS-based Foot Plate inspection device

 

Railways uses these small tack machines for track maintenance

Sent to zonal railways for implementation.

5.

2012-13

Track Laboratory

Fatigue testing of 60 Kg UIC rail sample for flaw growth rate

Track Design Directorate vide note no. CT/USFD dated 06.01.09 provided a test scheme for fatigue testing of 60 kg/m rail for flaw growth rate. As per advice of track design directorate testing was completed for 5.02 million loading cycles. Further, vide Track Design Directorate Note no. CT/USFD dated 03.02.2012 & 13.4.2012 it has been advised that flaw growth rate test on the sample which has earlier completed 5.02 million loading cycles to be continued till rapture as per revised test scheme. Further flaw growth rate of the sample was continued and completed for 5.58 million cycles. Necessary observations had been sent to Track Design Directorate vide note no. TM/TL/58 Vol.V dated 9.7.2012

 

 

 

Test Scheme

 

Longitudinal load was applied to create an axial stress of 117.0 MPa at neutral axis and vertical load near centre of rail at flaw location was applied to create a bending tensile stress of 160 MPa at rail bottom, in head up position without considering the tensile stress created by longitudinal load.

 

It is a study for framing technical specification by Track Design Directorate of RDSO

Report sent to Track Design Directorate for necessary action

6.

2012-13

Track Laboratory

Validation of rail stresses at head and foot by experimental Stress method

A test scheme for validation of rail stresses at head & foot of 52 Kg Rail, due to vertical & lateral loads, was advised by Track Design Directorate vide their letter No. CT/DG/Research dated 26.11.12.

As per the test scheme, necessary arrangement was made in track lab for loading and measurement of rail stresses at 10 locations. Strain gauges were fixed at 10 locations. The test was conducted on 52 kg rail laid on PSC sleeper having sleeper density of M+7 and 250mm ballast cushion. The test result has been sent to Track design Directorate vide this office note no. TM/TL/58/vol V dated 20.03.2013.

It is a study for framing technical specification by Track Design Directorate of RDSO

Report sent to Track Design Directorate for necessary action

 

Details of Technical Reports Published during 2012-2013

 

Sl. No.

Financial Year

Report No.

Description

1.

2012-13

TM-164

Specification of supply of RGM for standard gauge track for Metro Rail Project

2.

2012-13

TM-165

Provisional inspection check list of UNIMAT-4S machine

3.

2012-13

TM-166

Provisional maintenance schedule  manual of UNIMAT-4S machine

4.

2012-13

TM-167

Report on the case of frequent derailments in Udaipur-Himmat Nagar section of North Western Railway

5.

2012-13

TM-168

Final maintenance schedule manual for UNIMAT-4S machine

6.

2012-13

TM-169

Final inspection check list of UNIMAT-4S machine

7.

2012-13

TM-170

Procedure for inspection of wheels of On-track Machines

8.

2012-13

TM-171

Study Guide lines for RGM

 

             

 

ACHIEVEMENTS DURING 2011-2012

Sl. No.

Financial Year

Broad Area of Achievement

Title of Achievement

Description of achievement

Likely Benefit

Current Status of Implementation

1.

2011-12

Large Track Machines

Detail technical specifications of on-track machines

 

Following specifications have been prepared / revised and sent to Railway Board for approval:-

i)          Ballast Regulating Machine

ii)        Ballast Cleaning Machine

iii)       High Output Tamping Machine (09-3x)

iv)      Plain Track and Points & Crossing Tamping Machine

v)        Muck Disposal Unit (1676 MM Gauge)

vi)      Utility Track Vehicle

vii)      Specification for modification of wagon for transportation of track laying equipment.

For purchase of on-track machines suitable of Indian Railways condition

Implemented on Indian Railways

2.

2011-12

Small Track Machines

Revision of specifications

Following specifications have been revised and sent to Railway Board for approval:-

 

i)       Hydraulic Track Jack 15t capacity

ii)      Rail (Mono) cum Road Trolley

iii)     Double Action Weld Trimmer for A.T. Welding

iv)    Abrasive Rail Cutter

v)     Electronic Toe Load Measuring Device

vi)    Continuous Rail Thermameter

vii)   GPS-based Foot Plate inspection device

Railways uses these small tack machines for track maintenance

Sent to railway Board for approval

3.

2011-12

Small Track Machines

GPS-based Foot Plate inspection device

GPS-based Foot Plate inspection device, which was under trial in some Railways, has been upgraded to regular supply.

 

Sent to zonal railways for implementation.

4

2011-12

Track Laboratory

Fatigue testing of 60 Kg/m rail sample in connection with Testing of Rails for flaw growth rate

 

Track Design Directorate vide note no. CT/USFD dated 06.01.09 provided a test scheme for testing of rails for flaw growth rate. Rail sample was arranged by Track Design Directorate from E.C. Railway to conduct the further testing for flaw growth rate as per the above test scheme vide note no. CT/USFD dated 24.01.2011. It was also advised that testing is to be done till rupture of the sample.

 

Test Scheme:

Rails were subjected to longitudinal load to create an axial stress of 117.0 MPa and vertical dynamic load was applied so as to create a bending compressive stress of 114.06 MPa at rail head, in head up position.                         

 The rail sample was placed on testing frame which is capable of creating longitudinal load as well as bending cyclic load on the test bed under Rail track panel fatigue testing equipment.

Testing of rail sample: 

 

In order to create prescribed longitudinal and bending stress of 117.0 MPa and 114.06 MPa respectively in rail head, the rail sample (Lab ID. no. TL/11-4001) was pulled up to 98.0 ton axial load to create a stress of 117.0 MPa on rail head. Then sinusoidal vertical loading from 0.0 KN to 91.0 KN was  applied by vertical actuator to create bending compressive stress of 114.06 MPa at rail head. The frequency of application of load was 8.33 Hz and propagation of flaw was measured after completion of every 100,000 loading cycles. Total 5.02 million loading cycle has been completed. Track design directorate vide note no. CT/Welding/Policy dated 05-08-2011  advised to undertake the fatigue testing of A.T. weld sample on priority with holding the further testing of this rail sample for flaw growth rate.

 

It is a study for framing technical specification by Track Design Directorate of RDSO

Report sent to Track Design Directorate for necessary action

               

 

5.

2011-12

Track Laboratory

Fatigue and bending test of joggled fish plate developed by Engineering Workshop, Sabarmati

 

Sample of two pair of joggled fish plates 1.0m long for 52 kg/m rail section of composite light weight material along with clamps developed by Engineering Workshop/ Sabarmati was received for fatigue and bending tests through track design directorate of RDSO. Track Design Directorate also provided a test scheme containing details of loading and other parameters to be applied during testing/checking of its strength in fatigue and bending tests vide note no. CT/FF/3 dated 28.12.2010. 

 

As per test scheme strain gauges were also required to fixed at the critical locations of rail section to evaluate the value of stresses developed at these locations during different stages of fatigue testing of samples. A gap of 6.0mm at the joining point of two rail pieces i.e.  at centre was made before start of the testing.

It is a study for framing technical specification by Track Design Directorate of RDSO

Report sent to Track Design Directorate for necessary action


 

 

6.

2011-12

Track Laboratory

Fatigue testing of sample on Rail Track Panel fatigue Testing Equipment

Two pieces of 52 kg/m rails with 6.0mm gap at centre were fastened on test bench below the actuator for fatigue testing, as per test scheme Fatigue testing of one pair of joggled fish plates has been carried out on Rail Track Panel fatigue testing Equipment under the specified initial dynamic load of 0.4t to 4.0t at 5 hz frequency. Fish plate was broken/failed in fatigue testing after completion of 60,000 loading cycles during first stage of fatigue testing. No any response was observed from strain gauges fixed on rail during testing.

It is a study for framing technical specification by Track Design Directorate of RDSO

Report sent to Track Design Directorate for necessary action

7.

2011-12

Track Laboratory

Bending Test of Fish plates under static load

 

Similar arrangement was also been made to test the strength of other pair of joggled fish plate (Lab Id. no. TL/10-4002) under static loading. Static load was applied on test assembly of fish plates through vertical actuator at a step of 5.0 KN and deflection under load was recorded. Fish plates have also broken/failed in bending test at the total static load of 4.5t. The test report was been sent to track design directorate vide note no TM/TL/58 vol-V dated 11.03.2011.

 

It is a study for framing technical specification by Track Design Directorate of RDSO

Report sent to Track Design Directorate for necessary action

8.

2011-12

Track Laboratory

Testing of 60 kg A.T. welded rail having riser

 

Track Design Directorate had provided test schemes for testing of 60 kg A.T. welded rail having riser at both faces. Sample of welded rail with joggled fishplates was received from N.C. railway. The sample was subjected to dynamic loading for 5000 cycles at 10 hz frequency and value of stresses was recorded at twenty specified locations under following conditions:-

 

i)     Welded rail sample with joggled fishplates tightened at far ends.

ii)    Same welded rail sample without joggled fishplates

 

A test report containing all details regarding above testing has been sent to Track Design Directorate vide note no. TM/TL/58 dated 08.9.2011.

It is a study for framing technical specification by Track Design Directorate of RDSO

Report sent to Track Design Directorate for necessary action

9.

2011-12

Track Laboratory

Field trial for validation of equipment for measurement of stress free temperature by force application method

 

A test scheme was provided by  Track Design Directorate to conduct field trials for validation of equipment for measurement of stress free temperature by force application method.

Main line track near Badshah Nagar Railway station of Lucknow devision in NE Railway was selected for conduction the above field trial. Strain gauging at six location was done as per test scheme. This trial was done for temperature { (tp +10), (tp +15) & (tp +20) }. Deflecting load in step of 10 mm up to 100 mm and corresponding stresses were measured as per test scheme in co-ordination with track design official & P. Way staff of NE Railway. The test report has been sent to Track Design Directorate vide note No. TM/TM/62 dated 08-12-2011.

 

It is a study for framing technical specification by Track Design Directorate of RDSO

Report sent to Track Design Directorate for necessary action

 

 

 Details of Technical Reports Published during 2011-2012

 

Sl. No.

Financial Year

Report No.

Description

1.

2011-12

TM-157

Maintenance schedule manual for Track Laying Equipment (Simplex) - Provisional

2.

2011-12

TM-158

Inspection checklist for Track Laying Equipment (Simplex) - Provisional

3.

2011-12

TM-159

Final Maintenance schedule manual for Track Laying Equipment (Simplex)

4.

2011-12

TM-160

Final Inspection checklist for Track Laying Equipment (Simplex)

5.

2011-12

TM-161

Core Group Report on RGM

6.

2011-12

TM-162

Peak based maintenance standards for 160 kmph

7.

2011-12

TM-163

Testing of 60 Kg A.T. Welded rail joint having riser at both faces

  

 

            Papers Presented/Published in Important Seminar/Journals during 2011-2012 

 

Sl No.

Financial Year

Title of Paper

Presented/Authored by

Conference/Seminar/ Symposium/Journal

1.

2011-12

Implementation of Rail Grinding on IR-Key Technical issues

Shri T.K. Pandey, Director/TM      and

Shri Dilip Kumar, SSE/TM

National Technical Seminar of IPWE (India) held on 29th & 30th April’2011 at Banglore

 

   

ACHIEVEMENTS DURING 2010-2011

Sl. No.

Financial Year

Broad Area of Achievement

Title of Achievement

Description of achievement

Likely Benefit

Current Status of Implementation

1.

2010-11

Large Track Machines

Introduction of RGM on IR

Track Machines Directorate is playing a pivotal role in introduction of Rail Grinding on IR.  The directorate is actively involved in the following activities related with introduction of RGM on IR.

·          Selection of Routes on IR.

·          Planning of deployment on the selected routes by deciding speed, passes & profiles.

·          GDMS data.

·          Safety gears for RGM.

·          Evaluation of test sites etc.

Life of the rail will increase subsequently

Rail grinding implemented in IR

2.

2010-11

Large Track Machines

Maintenance Schedule Manual

To improve maintenance, final maintenance schedule for WST (Metex), BRM (PBR-400R) and

track laying equipment (Simplex) (TLE) have been prepared and issued to Zonal Railways. This will ensure uniform maintenance practices over all the Zonal Railways and would also help in improving the availability of these machines.

Proper maintenance & reduced breakdown of On-Track Machines

Implemented on Indian Railways

3.

2010-11

Large Track Machines

Inspection check list

To avoid failure of On-Track Machines in block section, it is essential that proper inspection are carried out by the field staff. For this purpose detailed inspection check list of worksite Tampers (Matex) and BRM (Plasser) have been prepared and issued to Zonal Railways

Proper inspection by field supervisors and officers for upkeep of on-track machines

Implemented on Indian Railways

4.

2010-11

Large Track Machines

Trouble shooting manual

To improve utilization of On-Track Machines, it is important to reduce their downtime and repair them in the shortest possible time. In this connection, trouble shooting manual of DGS (Plasser) has been prepared and issued to Zonal Railways.

 

Reduction in break down time and attention in emergencies.

Implemented on Indian Railways

5.

2010-11

Large Track Machines

Detail technical specifications of on-track machines

 

Following specifications of on- track machines have been revised and sent to Railway Board for approval:-

 

i)          Shoulder ballast cleaning machine with muck wagon

ii)             Ballast cleaning machine (BCM)

 

For purchase of on-track machines suitable of Indian Railways condition

Implemented on Indian Railways

6.

2010-11

Large Track Machines

Specifications and Drawings of spare parts of machines

 

i)     Proposed drawing of camping coach for large track machines including the list of amenities to be provided in the coach has been finalized and sent to the Railway Board.

ii)  Provisional Siding plan of Rail Grinding machines has been finalized in consultation with the Railways & OEMs & issued to all concerned Railways.

Issued as a guidelines for purchasing spares for on-track machines

Implemented on Indian Railways


ACHIEVEMENTS DURING 2009-2010

 

 

Sl. No.

Financial Year

Broad Area of Achievement

Title of Achievement

Description of achievement

Likely Benefit

Current Status of Implementation

1.

2009-10

Large Track Machines

Maintenance Schedule Manual

To improve maintenance, final maintenance schedule for Plasser Make Work Site Tamper has been prepared and issued to Zonal Railways. This will ensure uniform maintenance practices over all the Zonal Railways and would also help in improving the availability of these machines.

Proper maintenance & reduced breakdown of On-Track Machines

Implemented on Indian Railways

2.

2009-10

Large Track Machines

Inspection check list

To avoid failure of On-Track Machines in block section, it is essential that proper inspection are carried out by the field staff. For this purpose detailed inspection check list of UTV (Phooltas make) and Shoulder Ballast Cleaning Machine (FRM-85F) have been prepared and issued to Zonal Railways

Proper inspection by field supervisors and officers for upkeep of on-track machines

Implemented on Indian Railways

3.

2009-10

Large Track Machines

Detail technical specifications of on-track machines

 

Following specifications of large track machines have been revised and approved by the Railway Board :-

i)    Work Site Tampers

High output tamper (CSM machine)

Rail Bound Maintenance Vehicles  (RBMV)

Multipurpose Tampers

Ballast Regulating Machine with hopper and without hopper

Dynamic Track Stabilizer

vii)        Tungston Carbide Tip Tamping Tools

viii)       Utility Track Vehicle (UTV)

 

For purchase of on-track machines suitable of Indian Railways condition

Implemented on Indian Railways

4.

2009-10

Large Track Machines

Specifications and Drawings of spare parts of machines

 

i)   Specifications and Drawings of Tungsten carbide tamping tools for tamping express (09-3X) & CSM machines has been revised and approved by the Railway Board.

ii) Proposed drawing of camping coach for large track machines including the list of amenities to be provided in the coach has been finalized and sent to the Railway Board. 

Issued as a guidelines for purchasing spares for on-track machines

Implemented on Indian Railways

5.

2009-10

Small Track Machines

Rail Profile Measuring Equipment

Specification of Rail Profile Measuring Equipment (Mini-Prof) framed and got approval of Railway board

Specifications frame for rail profile measurement before & after rail in working

Machine procured & being used in Indian Railways

6.

2009-10

Small Track Machines

Cordless Train Speed Logger

One new small track machine “Cordless Train Speed Logger” along with its vendor has been developed and is under process of Railway Board’s approval.

Under trial and will be useful for instant checking of over speed of trains

Under trial

7.

2009-10

Track Laboratory

Enhancement in utilization of the Track Panel Fatigue Testing Machine

 

Till now the testing arrangement in Track Panel Fatigue Testing Machine was such that fatigue testing of only one specimen could be tested at a time. Normally a fatigue testing is done for 2 million cycles for which it takes 3 to 4 weeks of time. Now a new arrangement has been made which facilitate  fatigue testing of two specimens simultaneously using both the actuators in synchronised manner or otherwise. These two specimens can either be two PSC sleepers or one sleeper and one rail/welded rail joint.

 

Due to long time of 3-4 weeks being taken in a fatigue testing of one sample, quite often rail or sleeper specimen wait for their turn.  On account of this arrangement the output of RTFTE has almost doubled. It will now be possible to take up more number of fatigue testing of specimens.

 

Capacity enhancement for testing in laboratory

Implemented

8.

2009-10

Track Laboratory

Lateral and longitudinal ballast resistance of track in consolidated condition

 

For lateral and longitudinal ballast resistance trial, a test panel of three sleeper length of track was prepared by using shorter rail piece of 60 Kg rail (two meter) with elastic fastenings. This trial was carried out on 60Kg rail on 60Kg sleeper with sleeper density of 1660 nos./Km (sleeper spacing 600mm c/c) as per test requirement. The spacing of the sleeper were maintained as per test requirement and the tamping of the test track was carried out using CSM on each sleeper spacing before conducting trial. Standard LWR profile was maintained before conducting trial. Three readings at different locations were taken.

It is a study for framing technical specification by Track Design Directorate of RDSO

Report sent to Track Design Directorate for necessary action

  

Details of Technical Reports Published during 2009-2010

 

Sl. No.

Financial Year

Report No.

Description

22.

2009-10

TM-132

Inspection check-list for utility track vehicle (Phooltas make).

23.

2009-10

TM-133

Lab validation report of track recording system (TRC 7967).

24.

2009-10

TM-134

Report on track geometry measurement systems plying on European Railway & identification of suitable method of recording/system for Indian Railway.

25.

2009-10

TM-135

On their study visit to TTCI/USA, Siemens/Germany & Old Dalby/UK

26.

2009-10

TM-136

Inspection check-list for shoulder ballast cleaning machine (FRM 85F)

 

ACHIEVEMENTS 2008-2009

Sl. No.

Financial Year

Broad Area of Achievement

Title of Achievement

Description of achievement

Likely Benefit

Current Status of Implementation

1.

2008-09

Large Track Machines

Maintenance Schedule Manual

To improve maintenance, final maintenance schedule for Utility Track Vehicle (UTV) (Phooltas make), FRM 85F and Worksite Tamping Machine (Plasser make) have been prepared and issued to Zonal Railways. This will ensure uniform maintenance practices over all the Zonal Railways and would also help in improving the availability of these machines.

Proper maintenance & reduced breakdown of On-Track Machines

Implemented on Indian Railways

2.

2008-09

Large Track Machines

Inspection check list

To avoid failure of On-Track Machines in block section, it is essential that proper inspection are carried out by the field staff. For this purpose detailed inspection check list of Worksite Tamping Machine (Plasser make), FRM 85F and Utility Track Vehicle (Phooltas make)) have been prepared and issued to Zonal Railways.

Proper inspection by field supervisors and officers for upkeep of on-track machines

Implemented on Indian Railways

3.

2008-09

Large Track Machines

Trouble shooting manual

To improve utilization of On-Track Machines, it is important to reduce their downtime and repair them in the shortest possible time. In this connection, trouble shooting manual of Plasser Quick Relaying System (PQRS) has been prepared and issued to Zonal Railways.

 

Reduction the break down time and attention in emergencies.

Implemented on Indian Railways


 

4.

2008-09

Large Track Machines

Rail   Bound   Maintenance  Vehicle  for the Engineering Department   (8 wheeler RBMV)

 

Specifications for 8 wheeler Rail bound maintenance vehicle for the engineering department have been developed in consultation with all concerned directorates. Specification has been also approved vide Railway Board letter No. 2007/Track-III/TK/16 dated 25-02-2009. The RBMV is intended to cater mainly to following requirements:

 

i)     It should be able to run on all BG routes, bidirectional at speed of 105 KMPH.

It should be able to carry payload of 15 Tonnes. It includes two 13 m long 60 Kg Rails, switches, crossings e.t.c. at the open platform at the centre. For this one 8 Tonne-meter Crane has been provided at the centre of the platform.

iii) Two cabins have been provided at either ends for carrying all small track machines in one cabin and 12 to 14 persons in the other cabin.

It will be used as maintenance vehicle for carrying gangs & maintenance equipment to site

Specification sent to Railway Board for inviting tender.


 

5.

2008-09

Large Track Machines

Detail technical specification on on-track machines

 

 

 

i)     Track Relying Train (TRT)

ii)     High out put tamping   machine (09-3X)

iii)   Work site tampers

iv)         Continuous action tamping machine (09-32 CSM)

For purchase of on-track machines suitable of Indian Railways condition

Implemented on Indian Railways

6.

2008-09

Large Track Machines

Specification and drawings of spare parts of Machines

i)     Cover   plate   of   hydraulic  rail  clamp  cylinder  of  CSM  ( part  no. E 150-185)

Gland of hydraulic rail clamp cylinder of CSM (part no. E 150-184)

Sleeve of hydraulic rail clamp cylinder of CSM (part no. E 150-181)

 

Issued as a guidelines for purchasing spares for on-track machines

Implemented on Indian Railways

7.

2008-09

Track Laboratory

Fatigue testing of monoblock PSC sleepers to Drg. No. EDO/T- 2255 for  Dedicated Freight Corridor

As per test scheme of Track Design Dte. Fatigue and static load testing of  four sample of monoblock PSC sleeper (job no. TL/07-4001 to 4004) to Drg. No. EDO/T- 2255 was  completed and observed data was published as report no. TM-122.

It is a study for framing technical specification by Track Design Directorate of RDSO

Report sent to Track Design Directorate for necessary action

8.

2008-09

Track Laboratory

Field trial to determine Frame resistance Value

 

Track Design Directorate sent a trial scheme for  determination of  Frame resistance Value for track frame consists of 60/52Kg rail and 60Kg PSC sleeper with sleeper density of 1540,1660 & 1818. Accordingly, a site was selected near EMS workshop/RDSO. The data recording for 52/60 Kg rail track frame having sleeper density of 1540,1660 & 1818 was  completed and report was generated as report No. TM-120 & TM-131.

A study conducted for issuing maintenance guidelines

Report sent to Track Design Directorate for necessary action

9.

2008-09

Track Laboratory

Field trial to determine lateral and longitudinal ballast resistance (just after tamping).

 

Field trial for the determination of ballast resistance just after tamping of track were carried out on Utratiya Bakkas Section of Lucknow Division, Northern Railway in Km 1037/10-11 near Level crossing  198 C. This trial was carried out on 60Kg rail on 60Kg sleeper with sleeper density of 1540,1660 &1818 nos./Km(sleeper spacing 650,600, 550 mm c/c) as per test requirement. The spacing of the sleeper were maintained as per test requirement and the tamping of the test track was carried out using CSM on each sleeper spacing before conducting trial. Standard LWR profile was maintained before conducting trial.

 

A study conducted for issuing maintenance guidelines

Report sent to Track Design Directorate for necessary action

 Details of Technical Reports Published during 2008-2009

 

Sl. No.

Financial Year

Report No.

Description

1.

2008-09

TM-120

Frame resistance of track frame consisting of 52 Kg rail on 60 Kg PSC sleepers with ERC MK-III.

2.

2008-09

TM-121

Maintenance Schedules for Utility Track Vehicle (Phooltas make)

3.

2008-09

TM-122

Fatigue Testing of BG Monoblock Prestressed Concrete to Drawing No. EDO/T-2255 for Dedicated Freight Corridor (DFC).

4.

2008-09

TM-123

Review paper on Global Test Tracks with Special Reference to Heavy Haul Train Operation.

5.

2008-09

TM-124

Criteria for selection of test stretches for oscillation trails on BG routes of Indian Railways.

6.

2008-09

TM-125

Maintenance Schedule for Shoulder Ballast Cleaning Machine (FRM-85F).

7.

2008-09

TM-126

Inspection Check List for Shoulder Ballast Cleaning Machine (FRM-85F) (Provisional).

8.

2008-09

TM-127

Inspection Check List of Phooltas make Utility Track Vehicle (Provisional)

9.

2008-09

TM-128

Final trouble shooting manual for Plasser Quick Relaying System (PQRS)

10.

2008-09

TM-129

Final inspection check list for Plasser make Worksite Tamping Machine

11.

2008-09

TM-130

Final maintenance schedule manual of Plasser make Worksite Tamping Machine.

12.

2008-09

TM-131

Frame resistance of track frame consisting of 60 Kg rail on 60 Kg PSC sleeper.

 

 

 

Papers Presented/Published in Important Seminar/Journals during 2008-2009

 

Sl No.

Financial Year

Title of Paper

Presented/Authored by

Conference/Seminar/ Symposium/Journal

1.

2008-09

Track Monitoring and tolerances for high speed routes

Vijay Sharma,

Executive Director/TM

T.K. Pandey, Director/TM

R.P. Tewari, Dy. Director/TM

International Technical Seminar on High speed corridors and higher speeds on existing network at Mumbai on 8th and 9th Jaunary’2009

 



Source : WELCOME TO RDSO CMS Team Last Reviewed on: 08-10-2013  

  Site Map | Contact Us | RTI | EOI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.