Indian Railway main logo Welcome to Indian Railways RDSO Logo
  
View Content in Hindi
National Emblem of India

About Us

Directorates

Tenders

Vendor Interface

News & Events

Staff Welfare

Contact Us



Bookmark Mail this page Print this page
QUICK LINKS


INVESTIGATIONS- CONSULTANCIES RENDERED:

 

As per Procedure Order No. 1 of 2011 issued by Finance & Accounts Directorate of RDSO, GE Directorate has decided that the Consultancy Reports given below are classified as technical document and have been declared priced. For internal Railway use, these documents will be issued free of cost. For other users, the photo copy of all these documents will be charged @ Rs 100/-per page. These technical documents may not be reproduced, copied or commercially used without prior written permission of RDSO. For requirement of copies of these documents, contact to the address given in Head-“Contact Us” on web portal of GE Directorate on RDSO’s website.

 

S.No.

Title

Report No.

1.

Rehabilitation of weak formation in Barauni-Katihar Section, Katihar Division, N.E. Railway

GE : 32

2.

Rehabilitation of weak formation in Gaur-Malda Town, Stations, Malda Division, Eastern Railway

GE : 33

3.

Report on use of Fly Ash for Construction of Embankment on Tamluk -Digha New Rail Link Construction Project, KGP Division, S.E. Railway

GE : 34

4.

Rehabilitation of unstable formation between Itikayala-Kurnool Town Station, Hyderabad Division S.C. Railway

GE : 36

5.

Rehabilitation of unstable formation on SIR-UHL section, UMB Division, Northern Railway

GE : 38

6.

Rehabilitation of unstable formation between Panskura & Haldia Section of Kharagpur Division, S.E. Railway

GE : 40

7.

Rehabilitation of unstable formation between Tandur-Mantatti Stations, Secunderabad Division, S.C.Railway

GE : 41

8.

Rehabilitation of unstable formation between Salva-Chacher & Kamptee Kalumna Section, Nagpur Division, S.E. Railway

GE : 42

9.

Use of Fly Ash in Earthwork for Construction of New BG Line between Fatua and Islampur on Danapur Division, Eastern Railway

GE : 43

10.

Rehabilitation of unstable formation in Rampur-Lalkuan Section, Izzat Nagar Division, N.E.Railway

GE : 45

11.

Rehabilitation of weak formation on Sanchi-Vidisha Section Central Railway

GE : 52

12.

Status Report on KRCL Cutting (Part-1), Konkan Railway

GE : 54

13.

Consultancy Report for Construction of Railway Formation on Soft Marine Clay on Panju Island between Borivali & Virar Section, Mumbai Central Division, Western Railway

GE : 56

14.

Design of 4th line formation on Thiruvallur-Pattabhiram Section of Chennai-Mumbai route of Southern Railway

GE : 57

15.

Design of formation of 3rd line between Ennore and and Attipatu Stations, Southern Railway

GE : 58

16.

Status Report on KRCL Cutting(Final),Konkan Railway

GE : 59

17.

Rehabilitation of weak formation between Pathankot & Jammu Tawi stations on Firozpur Division, Northern Railway

GE:CR-60

18.

Rehabilitation of weak formation between Tenya & Karnasubarna stations on Howrah Division, Eastern Railway

GE:CR-61

19.

Consultancies report on Rohtak-Jakhal doubling, Northern Railway

GE:CR-62

20.

Problem of sinkage of bank between Taramani & Velacheri Section, MRTS-Chennai-Phase-II

GE:CR-63

21.

Consultancy on problematic stretches on Ratlam-Godhara section, Western Railway

GE:CR-64

22.

Consultancy report on bank slip between Dharuadih & Bamra on Jharsunguda-Rourkela section, Chakradharpur, S.E. Railway

GE:CR-65

23.

Consultancies report on problematic stretches on Lumding-Badarpur hill section, N.F.Railway

GE:CR-66

24.

Formation problem of Rann of Kutch, Palampur-Gandhidham-Kandla Gauge Conversion Project, Western Railway

GE:CR-69

25.

Consultancy for cuttings on Lumding-Silcher Section, NF Railway

GE:CR-70

26.

Consultancies report on running of heavy axle load on Kotavalsa-Kirandul Section, Waltair Division, East Coast Railway

GE:CR-71

27.

Consultancy report for geotechnical problems on existing MG line between Lumding-Badarpur Section, NF Railway

GE:CR-72

28.

Consultancy report for problematic stretches between Kumarghat-Agartala Section, NF Railway

GE:CR-74

29.

Consultancy report for cuttings on Lumding-Silcher Section, NF Railway

GE:CR-75

30.

Consultancy report on rehabilitation of bad formation between Bhagalpur–Maharajpur stations, Malda Division, Eastern Railway

GE:CR-78

31.

Investigation of problematic stretches between Sarona-Bhilai stations on Raipur-Durg Section, Raipur Division, South East Central Railway

GE:CR-83

32.

Rehabilitation of Cutting in Hassan-Bangalore New BG Line Section, South Western Railway

RDSO/2006/ GE:CR-0085

33.

Slope stability analysis for proposed permanent diversion for providing Kachchh branch canal crossing at bridge no. 76-B, MCX-144 of Radhanpur-Palanpur Section, Western Railway

RDSO/2006/ GE:CR-0086

34.

Investigation of problematic stretches of Palasa–Khurda Road & Khurda Road–Bhadrakh Sections of Khurda Division, East Coast Railway

RDSO/2006/ GE:CR-0087

35.

Consultancy on Construction of New BG Bye-Pass Line between Ib & Jharsuguda Stations of Bilaspur Division, South East Central Railway

RDSO/2006/ GE:CR-0088

36.

Slope Stability Analysis for Proposed Permanent Diversion for Providing Kachchh Branch Canal Crossing At Bridge No. 76-B, NCX-144 Of Radhanpur-Palanpur Section, Western Railway

RDSO/2006/ GE:CR-0089

37.

Consultancy report on problematic stretches on Dewas-Makshi Section, Ratlam Division, Western Railway

RDSO/2006/ GE:CR-0090

38.

Rehabilitation of weak formation between Gonda Kachehri & Jarwal Road stations, Lucknow Division, North Eastern Railway

RDSO/2006/ GE:CR-0091

39.

Consultancy report on rehabilitation of weak formation between Kachhpura & Bheraghat and Karakbel & Shridham Stations in Itarsi-Jabalpur Section of Jabal Division, West Central Railway

RDSO/2006/ GE:CR-0092

40.

Consultancy report on rehabilitation of weak formation between Bathinda-Sriganga Nagar Stations of Firozpur Division, Northern Railway

RDSO/2006/ GE:CR-0093

41.

Consultancy report on suitability of blanketing material for permanent treatment of weak between Delhi-Ambala-Kurukshetra Section of Delhi Division, Northern Railway

RDSO/2006/ GE:CR-0094

42.

Consultancy Report on Construction of Railway Embankment at Y-Junction of Dibrugarh-Moranhat Rail Link Point, NF Railway

RDSO/2006/ GE:CR-0095

43.

Rehabilitation of Week Formation in Moradabad-Bereilly Section, Moradabad Division, Northern Railway

RDSO/2006/ GE:CR-0096

44.

Enbankment Slip on Pathankot-Joginder Nagar Section in Ferozpur Division of Northern Railway

RDSO/2007/ GE:CR-0097

45.

Geotechnical Investigation of Weak Formation in Itarsi-Bhopal Section of Bhopal Division, West Central Railway

RDSO/2006/ GE:CR-0098

46.

Consultancy Report on Rehabilitation of Bank on the Approach of Bridge no.144 between Sabour-Lailakh Mamalkha Stations, Malda Division, Eastern Railway

RDSO/2007/ GE:CR-0099

47.

Consultancy Report on Tilting of Bridge no.172 between Swadinpur-Nalhati Stations, Howrah Division, Eastern Railway

RDSO/2007/ GE:CR-0100

48.

Consultancy Report on Rehabilitation of Weak Formation between Asvali -Padli Stations, Bhusaval Division, Central Railway

RDSO/2007/ GE:CR-0103

49.

Consultancy Report on Rehabilitation of Weak Formation between Ratlam-Nagda Stations of Ratlam Division, Western Railway

RDSO/2007/ GE:CR-0104

50.

Consultancy for Construction of Railway Embankment in Kutuha Beel Area in Bogibeel Bridge Project , Northeast Frontier Railway

RDSO/2007/ GE:CR-0106

51.

Consultancy Report on Rehabilitation of Weak Formation between Ujjain -Indore and Ujjain-Nagda Sections of Ratlam Division, Western Railway

RDSO/2007/ GE:CR-0107

52.

Consultancy Report on Rehabilitation of Bank on the Approach of Bridge No. 27 bet.Anpara-Krishanashila Stations, Dhanbad Division, E.C.Railway

RDSO/2007/ GE:CR-0108

53.

Consultancy Report on Slope Stability Analysis of New Line Between Dighwara and Sonepur Stations, Sonepur Division, East Central Railway

RDSO/2007/ GE:CR-0109

54.

Consultancy Report on Slope Stability Analysis of 4th Line Construction between Tikiapara-Santragachi Stations, Kharagpur Division, South Eastern Railway

RDSO/2007/ GE:CR-0110

55.

Consultancy Report on Rehabilitation of Weak Formation between Chuchura-Hoogly Stations, Howrah Division, Eastern Railway

RDSO/2007/ GE:CR-0111

56.

Consultancy Report on Rehabilitation of Weak Formation between Miraj -Kolhapur Stations, Pune Division, Central Railway

RDSO/2007/ GE:CR-0112

57.

Consultancy Report on Rehabilitation of Weak Formation between Jhargram-Gidhni Stations, Kharagpur Division, South Eastern Railway

RDSO/2007/ GE:CR-0113

58.

Consultancy Report on Rehabilitation of Weak Formation between Nagarnabi-Rajgram Stations, Howrah Division, Eastern Railway

RDSO/2007/ GE:CR-0114

59.

Consultancy Report on Rehabilitation of Weak Formation between Durgapur-Rajbandh Stations, Asansol Division, Eastern Railway

RDSO/2007/ GE:CR-0115

60.

Consultancy Report on Rebuilding of Bridge No. 39 on Permanent Diversion between Phephna-Chitbaragaon Stations, Chhapra-Allahabad Section, Varanasi Division, North Eastern Railway

RDSO/2007/ GE:CR-0116

61.

Consultancy Report on Rehabilitation of Weak Formation between Bandel-Barharwa Stations, Howrah Division, Eastern Railway

RDSO/2007/ GE:CR-0117

62.

Consultancy Report on Rehabilitation of Weak Formation between Krishanagar City-Lalgola Stations Sealdah Division, Eastern Railway

RDSO/2007/ GE:CR-0118

63.

Consultancy Report on Slope Stability Analysis of New Line Construction between Tarkeswar-Bishnupur Stations,Howrah Division,Eastern Railway

RDSO/2007/ GE:CR-0119

64.

Consultancy Report on Rehabilitation of Weak Formation between Budhpank -Talcher Stations, Khurda Road Division, East Coast Railway

RDSO/2008/ GE:CR-0120

65.

Consultancy Report on Rehabilitation of Weak Formation between Dasnagar-Radhamohanpur Stations Kharagpur Division, South Eastern Railway

RDSO/2008/ GE:CR-0121

66.

Consultancy Report on Rehabilitation of Weak Formation from Km 241244 (UP) between Asanboni-Salgajhari Stations on Tata Nagar -Kharagpur Section, Kharagpur Division, South Eastern Railway

RDSO/2008/ GE:CR-0122

67.

Consultancy Report on Rehabilitation of Weak Formation between Pandrasali-Rajkharswan Stations, Chakradharpur Division, South Eastern Railway

RDSO/2008/ GE:CR-0123

68.

Consultancy Report on Pump House Cutting in KRCL.

RDSO/2008/ GE :CR-124

69.

Consultancy Report on Slope Stability Analysis of 29 Meter High Bank at Katra, Firozpur Division, Northern Railway

RDSO/2008/ GE:CR-0125

70.

Consultancy Report on Rehabilitation of Weak Formation between Sonakhan-Sogra Stations,Chakradharpur Division, South Eastern Railway

RDSO/2008/ GE:CR-0126

71.

Consultancy Report on Stabilization of Cutting Slope in Hassan– Shravanbelagola Section, Bangalore Division, South Western Railway.

RDSO/2008/ GE:CR-0127

72.

Consultancy Report on Rehabilitation of Weak Formation between Yeshvantpur-Tumkur Stations, Bangalore Division, South Western Railway.

RDSO/2008/ GE:CR-0128

73.

Consultancy Report for rehabilitation of weak formation between Karaikkudi-Manamadurai Stations, Madurai Division, Southern Railway

RDSO/2008/ GE:SR-0129

74.

Consultancy for Rehabilitation of Weak Formation in Bathinda-Sriganganagar Section, Ambala Division, Northern Railway

RDSO/2008/ GE:CR-0130

75.

Consultancy Report on Rehabilitation of Weak Formation between Guna -Badarwas Stations Bhopal Division, West Central Railway

RDSO/2008/ GE:CR-0131

76.

Consultancy Report on Slope Stability Analysis of New Line between Nelamangala-Solur Stations, Bangalore Division, South Western Railway

RDSO/2009/ GE:CR-0132

77.

Consultancy Report on Rehabilitation of unstable formation between Gachhuari-Narayanpur Stations, Sonpur Division, East Central Railway

RDSO/2009/ GE:CR-133

78.

Consultancy Report on Rehabilitation of Unstable Formation between Gauchhari–Pasraha Stations, Sonpur Division, East Central Railway

RDSO/2009/ GE:CR-0135

79.

Consultancy Report for Geotechnical Problems on Existing BG Line in Lumding Division, N.F.Railway

RDSO/2009/ GE:CR-0136

80.

Consultancy Report on Construction of high Bank in Between Chhindwara-Nagpur Gauge Conversion Line in Nagpur Division, South East Central Railway

RDSO/2010/ GE:CR-0138

81.

Consultancy Report on Rehabilitation of Unstable Formation between Gauchhari-Pasraha Stations, Sonpur Division, East Central Railway

RDSO/2010/ GE:CR-0140

82.

Consultancy Report on Rehabilitation of Washed out locations between Paliakalan-Dudhwa & Tikunia–Manjhrapurab Stations, Gonda-Mailani Section, Lucknow Division, North Eastern Railway

RDSO/2010/ GE:CR-0137

83.

Consultancy Report for Geotechnical Problems on Existing BG Line in Rangiya & Tinsukia Division, N. F. Railway

RDSO/2010/ GE:CR-0141

84.

Consultancy Report on Construction of high Bank in between Vinaiki-Sikara Stations, Jabalpur-Gondia Gauge Conversion Line in Nagpur Division, South East Central Railway

RDSO/2010/ GE:CR-0142

85.

Consultancy Report for Geotechanical Problems on Existing MG Line between Phiding-Mahur Stations, NF Railway

RDSO/2010/ GE:CR-0139

86.

Consultancy Report on Rehabilitation of weak formation between Gadag-Bagalkot Station, Hubli Division, South Western Railway

RDSO/2010/ GE:CR-0143

87.

Consultancy Report on Gauge conversion between Villupuram-Vellore Cantt Section, Tiruchchirappalli division, Southern Railway

RDSO/2010/ GE:CR-0146

88.

Consultancy Report on Review of Blanket Thickness as per “Guidelines and Specifications of Higher Axle Load” for New Line Between Tarkeshwar-Bishnupur Section and Doubling Projects of Ambikakalna-Nabadwip Dham and Katwa-Patuli Sections, Howrah Division, Eastern Railway

RDSO/2010/ GE:CR-0147

89.

Consultancy Report on Rehabilitation of Weak Formation between Ballia & Bansdih Stations in Chhapra-Aunrihar Section, Varanasi Division, North Eastern Railway

RDSO/2010/ GE:CR-0144

90.

Consultancy Report on New Line between Nagapattinam-Velankanni Section, Tiruchchirappalli Division, Southern Railway

RDSO/2010/ GE:CR-0148

91.

Consultancy Report on Rehabilitation of unstable formation between Narangi-Panikhaiti Stations at Km 20/5-6, New Guwahati-Lumding Section, Lumding Division, Northeast Frontier Railway

RDSO/2011/ GE:CR-0149

92.

Consultancy Report on review of blanket thickness between Doubling Projects of Katwa-Patuli Section, Howrah Division, Eastern Railway (Part-1)

RDSO/2011/ GE:CR-0150

93.

Consultancy Report on review of blanket thickness between Doubling Projects of Ambika Kalna-Nabadwip Dham Section, Howrah Division, Eastern Railway

RDSO/2011/ GE:CR-0151

94.

Consultancy Report on review of blanket thickness between Doubling Projects of Azimganj-Manigram Section, Howrah Division, E.Railway

RDSO/2011/ GE:CR-0152

95.

Consultancy Report on review of blanket thickness between Doubling Projects of Nalhati-Sagardighi Section, Howrah Division, Eastern Railway

RDSO/2011/ GE:CR-0153

96.

Consultancy Report on rehabilitation of unstable formation between Narangi-Panikhaiti-Panbari Stations at Km 20/3-4 & 31/4-5 in New Guwahati-Lumding Section, Lumding Division, N.F. Railway

RDSO/2011/ GE:CR-0154

97.

Consultancy Report on rehabilitation of unstable formation between Narangi-Panikhaiti Stations at Km 21/6-7 in New Guwahati-Lumding Section, Lumding Division, N.F. Railway

RDSO/2011/ GE:CR-0155

98.

Consultancy Report on Rehabilitation of Unstable formation between Narangi-Panikhaiti Stations at Km 21/9-22/0 in New Guwahati-Lumding Section, Lumding Division, N.F. Railway

RDSO/2011/ GE:CR-0156

99.

Consultancy Report on Rehabilitation of Unstable Formation between Gaurmalda-Jamirghata Stations, Malda Division, Eastern Railway

RDSO/2011/ GE:CR-0157

100.

Consultancy Report on Rehabilitation of weak formation between Umesh Nagar-Sahibpur Kamal Stations, on Begusarai-Khagaria Section, Sonpur Division, East Central Railway.

RDSO/2012/ GE:CR-0159

101.

Consultancy Report on new construction between Namkhana & Chandranagar Stations, Sealdah Division, Eastern Railway

RDSO/2012/ GE:CR-0158

102.

Consultancy Report on rehabilitation of weak formation between Gaipura & Berohi Stations, Allahabad Division, N.C.Railway

RDSO/2012/ GE:CR-0160

103.

Consultancy Report on Rehabilitation of Weak Formation between Bina-Dailwara Stations, Jhansi Division, North Central Railway

RDSO/2012/ GE:CR-0161

104.

Consultancy Report on Rehabilitation of Weak Formation for Km. 240 to 241 Km. DN. Line between Balasore & Nilgiri Road Stations on Kharagpur-Bhadrak Section, Kharagpur Division, SE Railway

RDSO/2013/ GE:CR-0162

105.

Consultancy Report on Rehabilitation of Weak Formation for Km. 196/20-18 DN. Line between Rajghat & Amarda Road Stations on Kharagpur-Bhadrak Section, Kharagpur Division, SE Railway

RDSO/2013/ GE:CR-0163

106.

Consultancy Report on Rehabilitation of Weak Formation for Km. 193/18-16 & 194/30-28 DN. Line between Rajghat & Amarda Road Stations on Kharagpur-Bhadrak Section, Kharagpur Division, SE Railway

RDSO/2013/ GE:CR-0164

107.

Consultancy Report on Rehabilitation of Weak Formation for Km. 180/22-20 DN. Line between Lakshannath & Jaleswar Stations on Kharagpur-Bhadrak Section, Kharagpur Division, SE Railway

RDSO/2013/ GE:CR-0165

108.

Consultancy Report on Rehabilitation of Weak Formation for Km. 179/28-26 & Km.175/16-14 DN. Line between Angua & Jaleswar Stations on Kharagpur–Bhadrak Section, Kharagpur Division, SE Railway

RDSO/2013/ GE:CR-0166

109.

Consultancy Report on Rehabilitation of Weak Formation for Km. 174/86, DN. Line between Angua & Lakshnath Road Stations, Kharagpur-Bhadrak Section, Kharagpur Division, SE Railway

RDSO/2013/ GE:CR-0167

110.

Consultancy Report on Rehabilitation of Weak Formation between Rupsa & Haldipada Stations (Km. 215/23-25 & 216/11-13 UP line), Kharagpur-Bhadrak Section, Kharagpur Division, SE Railway

RDSO/2013/ GE:CR-0170

111.

Consultancy Report on rehabilitation of Unstable Formation (from km 41.85 to km 42.80) at Udaipur Station Yard in Agartala-Udaipur-Sabroom New B.G. line Project, NF Railway

RDSO/2013/ GE:CR-0171

112.

Consultancy Report on Rehabilitation of Unstable Formation between stations Sabira & Markona (Km. 271/16-14 & 275/20-18 DN line) on Kharagpur-Bhadrak Section, Kharagpur Division, SE Railway

RDSO/2013/ GE:CR-0169

113.

Consultancy Report on Rehabilitation of Weak Formation between Maghar and Sahjanwa Stations, Lucknow Division, N.E.Railway

RDSO/2013/ GE:CR-0168

114.

Inspection of doubling project between Bhigwan-Mohol and Tilati-Gulbarga stations, Solapur Division, Central Railway

RS/G/95-CR

115.

Consultancy report on design of formation for doubling in bad bank area between Sankrigoli-Sahibganj (Km 227.9-228.4) on Barharwa-Sahibganj Section & Lailakh Mamalka-Sabour (Km 292/0-293/0) on Sahibganj-Bhagalpur Section, Malda Division, Eastern Railway

RDSO/2014/ GE:CR-172

116.

Inspection of Lumding-Silchar gauge conversion project, Northeast Frontier Railway

RS/G/72-NFR

117.

Inspection and quality check of earthwork of doubling project between Chengalpattu-Villupuram Section, Southern Railway

RS/G/95-SR

118.

Inspection and quality check of earthwork for Koderma-Tilaiya new BG line Project, East Central Railway

RS/G/95-ECR

119.

Inspection and quality check of construction of 3rd line on Bina-Bhopal Section (under execution by RVNL)

GE/GEN/134- RVNL

120.

Inspection of High Embankment of Hassan-Mangalore New BG Line in Solur-Thippsandra Section, South Western Railway

GE/GEN/95-SWR

121.

Consultancy Report on Design of Foundation for doubling between Sondalia-Labutala Stations of Barasat-Hasnabad Section, Sealdah Division, Eastern Railway

RDSO/2014/ GE:CR-0173

122.

Consultancy Report on Unstable formation Between Udhna (UDN)-Ukai Songarh(USD)stations of Udhna-Jalgaon section, Mumbai Division, Western Railway

RDSO/2015/ GE:CR-0174

123.

Consultancy Report on Unstable formation Between Hingoli (HNL)-Nandapur (NDPR) Stations of Purna (PAU)-Akola (AK) section, Nanded Division, South Central Railway

RDSO/2015/ GE:CR-0175

124.

Consultancy Report on construction of High Bank in proposed B.G. Detour Portion at CH: 68500 in Chhindwara- Nainpur-Mandlafort Gauge Conversion Project in Nagpur Division of South Central Railway

RDSO/2016/ GE:CR-0176

125.

Consultancy Report on newly constructed formation between Sahibganj and Sakrigali stations in Malda Division of Eastern Railway

RDSO/2016/ GE:CR-0177

126.

Suitability Assessment of Fly Ash of Satpura – TPS for Construction of Railway Embankment of 3rd Line in Bhopal-Itarsi Section, WCR

Letter No. RS/G/106/Fly Ash Vol-III

127.

Consultancy Report on Stability/Adequacy of Embankment between Talvadiya and Khirkiya stations in Bhopal Division of West Central Railway

RDSO/2016/ GE:CR-0179

128.

Consultancy Report on Submergence of Railway Line between BiyavraRajgarh and Pachor Road stations, Bhopal Division, West Central Railway.

RDSO/2016/ GE:CR-0178

129.

Report on earthwork for third line work in Bhopal-Itarsi Section, being executed by RVNL in West Central Railway.

 Letter No. GE/GEN/134/RVNL Vol.III

130.

Consultancy Report on failure of Embankments in Ernakulam-Kottayam-Kayankulam Doubling Project   of Southern Railway.

RDSO/2016/ GE:CR-0180

131.

Inspection of completed formation work between Keshabpur-Mahisadal Section, Kharagpur Division, South Eastern Railway.

Letter no. GE/GEN/137/RVNL

132.

Consultancy Report on strengthening of Railway Embankment for North & South Approaches of Rail cum Road Bridge across the Ganga at Patna, East Central Railway.

Letter no. RS/G/72/ECR

133.

Consultancy Report on Strengthening/Repair to the formation of Sukinda-Jakhapura flyover line, Khurda Road Division, East Coast Railway.

RDSO/2016/ GE:CR-0181

134.

Consultancy about use of Geocomposite Drain behind Bridge Abutment/Retaining Wall in Jiribam-TupulNew  Line  Project of N.F.Railway.

Letter no. RS/G/72/

NFR Vol.V,

135.

Consultancy about use of Geocomposite Drain below Embankment on weak sub-soil in Doubling work between Sondaliya-LabutalaStation  inBarasat-Hasunabad Section of Sealdah Division in Eastern Railway.

Letter No. RS/G/95/

ER Vol.XV

136.

Consultancy report on remedial/strengthening measures for Cuttings in Barkichanpi (BICI)-Tori (TORI) Section, Ranchi Division, South Eastern Railway

RDSO/2017/GE:CR-0183

137.

Consultancy report on Ground Improvement work for new embankment works for new embankment between Ernakulam-Kottayam-Kayankulam doubling project, Southern Railway

RDSO/2017/GE:CR-0184

138.

Consultancy report on  formation treatment between Hubballi-Hospet and Hubballi-Tumkur sections of South Western Railway

RDSO/2017/GE: CR-0185

139.

Consultancy report on unstable cuttings between Shanki–Sidhwar single BG line, Koderma-Ranchi new line project, Dhanbad Division, East Central Railway

RDSO/2017/GE: CR-0186

140.

Consultancy report on Slope Stability Test at High Bank location on 3rd new BG Railway line between Durg-RJN of Durg-Nagpur section of South East Central Railway

RDSO/2017/GE: CR-0187

141.

Consultancy report on remedial measures for boulder/rock mass falling on the track in South east Ghat section between Karjat&Lonavala Railway Stations, Mumbai Divisions, Central Railway

RDSO/2017/GE: CR-0188

142.

Consultancy Report On Boulder/Rock mass falling on the track in Kottavalsa-Kirandul section between Chimidipalli & BorraGuhalu Railway Station, Waltair Division, East Coast Railway

RDSO/2017/ GE: CR-189

143.

Consultancy Report on  Design of formation for doubling  between Bazarsau-Azimganj Junction in Howrah Division, Eastern Railway.

RDSO/2017/ GE: CR-0190

 


 

 



Source : WELCOME TO RDSO CMS Team Last Reviewed on: 27-11-2017  

  Site Map | Contact Us | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.